The table below gives an overview of the compliance rate as regards rail.<br />

Parameter 4<br />

Electrification<br />

Track gauge 1435mm<br />

ERTMS implementation<br />

Line speed>=100km/h<br />

Axle load (>=22.5t)<br />

Train length (740m)<br />

Rail technical parameters<br />

Requirement<br />

Electrified rail network km as a proportion (%) of CNC<br />

rail network km<br />

Standard (1435mm) track gauge as a proportion (%) of<br />

CNC rail network km<br />

Length of Permanent Operation (excluding operational<br />

test lines) of both ERTMS and GSM-R on rail network,<br />

as a proportion (%) of CNC rail network km<br />

Length of freight and combined line with allowing for a<br />

maximum operating speed greater than or equal to 100<br />

km/h, as a proportion (%) of CNC rail network km<br />

without load restriction<br />

Length of Freight and combined line with a permitted<br />

axle load greater than or equal to 22.5 tonnes, as a<br />

proportion (%) of CNC rail network km<br />

Length of freight and combined line with a permitted<br />

train length greater than or equal to 740m, as a<br />

proportion of CNC rail network km<br />

2015<br />

92%<br />

72%<br />

13%<br />

92%<br />

76%<br />

23%<br />

Table 2 – Rail technical parameters (source TENtec)<br />

Road<br />

The total length of the road network included in the <strong>Mediterranean</strong> Corridor is about 5500<br />

km, with Spain covering more than 50% of the entire Corridor.<br />

As regards the parameter “Motorway or Express roads” only a few sections are not<br />

motorways such as the Hungarian section close to the Ukrainian border.<br />

The table below shows the compliance rate of the <strong>Mediterranean</strong> Corridor's roads.<br />

Parameter<br />

Express road/<br />

motorway<br />

Availability of clean<br />

fuels (stations)<br />

Road technical parameters<br />

Requirement<br />

Road network km classified as motorway or express road,<br />

as a proportion (%) of CNC road section km.<br />

Number of fuel stations offering plug-in electricity,<br />

hydrogen, liquid biofuels, LNG/CNG, bio-methane or LPG<br />

along CNC road sections or within 10km from its junctions.<br />

2014 2015<br />

95% 98%<br />

259 259<br />

4 KPI calculation for line speed, axle load and train length includes rail lines that serve passenger<br />

traffic.<br />

9