CROATIA<br />

Current status<br />

The most relevant critical issues are related to:<br />

a) the existing limitations to train length (360 to 600m) on all the sections<br />

belonging to the Corridor, especially on the stretch from Rijeka up to Zagreb,<br />

where maximum admissible train length is limited to 360 meters<br />

b) the only railway lines that allow train speed above 100 km/h are Dugo Selo-<br />

Koprivnica and Moravice-Ogulin<br />

c) the urban node of Zagreb suffers from a lack of capacity in the short-medium<br />

term<br />

d) rail last mile interconnections to Rijeka Port shall be enhanced; in particular<br />

Zagreb-Rijeka railway line suffers from low technical standards with unfavourable<br />

route characterised by hard ascents, sharp and low radiant curves<br />

e) the missing railway last mile connection to Zagreb airport<br />

f) the entire Corridor railway alignment in Croatia is not equipped with ERTMS,<br />

the available signalling system is APS.<br />

On-going and planned main interventions<br />

The following map below shows the matching between the detected critical issues and<br />

the on-going and/or planned interventions.<br />

6<br />

5<br />

Rijeka<br />

L<br />

4<br />

8<br />

L<br />

L<br />

2<br />

L<br />

3<br />

L<br />

1<br />

Zagreb<br />

7<br />

CROATIA<br />

Rail: Compliance by 2030<br />

Compliant (Status 2015)<br />

Works on - going, compliance expected<br />

Works still to be to started, compliance expected<br />

Works foreseen but delayed, compliance doubted<br />

Works not yet planned/agreed for completion<br />

Reason f or non - compliance<br />

E No ‘Electrification’<br />

L ‘Line speed < 100 km/h’<br />

A ‘Axle load < 22.5 tonnes’<br />

G<br />

‘UIC gauge ? 1,435 mm’<br />

Status: June 2016<br />

Figure 16 –Croatian sections compliance by 2030 and main project impacting on KPI<br />

39