Airports<br />

Connection of main airports with rail network is fundamental to achieve the intermodality<br />

objective set by the Regulation. About 66% of the main airports (4 out of 6) belonging to<br />

the Corridor, are currently not connected with heavy rail.<br />

For the corridor airports the progress to provide capacity for alternative fuels for aircrafts<br />

shall be monitored in the coming months, as no project is in place yet.<br />

Seaport<br />

Bottlenecks identified for seaports will be solved by 2030. The provision of alternative<br />

fuels for maritime transport as well as the deployment of operational single window/emaritime<br />

services in order to achieve interoperability will be further investigated in the<br />

coming months.<br />

Inland ports<br />

All inland ports will be connected by rail as required by the Regulation (EU) N 1315/2013.<br />

The connection by CEMT Class IV waterway will be achieved by projects solving this<br />

bottleneck by 2030.<br />

Corridor compliance maps<br />

At Corridor level, the aggregation of the information provided by the Stakeholders in the<br />

Project list permits to draw the following compliance maps for 2030 for rail and IWW.<br />