11.12.2012 Views

Permafrost

Permafrost

Permafrost

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

dangerous pollutants, including heavy metals, radioactive nuclides and others which in case of<br />

possible failures will put the most serious loss to an environment and safety of ability to live of<br />

the person.<br />

In rather small territory on area of NID one of the most world's largest tailing dumps have<br />

settled down at once some: "Lebjge", the last two years ago began the world's largest after its<br />

expansion and opening of the second field. The tailing dumps №1, №5 and "Nadegdinskoe" are<br />

erected on first principle of construction of constructions on permafrost, i.e. with a condition of<br />

preservation always frozen barrier the screen inside the dam. The tailing dump " Lebjge " it is<br />

constructed on thawed and frozen type.<br />

The basic complexity of similar constructions in permafrost is that they inevitably are in a<br />

close contact with water which is the manifest enemy of a frozen ground.<br />

On a background of the general global warming of a climate or at negative local<br />

man-caused influences formations through taliks in a body of a dam are possible. Outflow of<br />

waters can occur both on a surface of a dam, and through underground waters. Besides it<br />

because of the strongest defrost effect of hardly salted waters, occurs thaw through always<br />

frozen breeds of a protecting dam. Goes permafrost thaw directed as vertically (on depth), and<br />

in a horizontal direction (in area extent). In NID this moment is most important, since the<br />

territory in a geological structure is submitted lake and is high icy earth thicknesses peat loams,<br />

loam having mesh cryotexture and sand with sandy loams with massive cryotexture, and as<br />

ice-borne sediments adjournment submitted by loams, pebbles, boulder bed. The defrosting it is<br />

high icy ground leads to to formation thermokarst subsidence, especially dangerous to a steady<br />

status of a dam. Not smaller danger to stability of a dam represent frost bursting, etc. dangerous<br />

cryogenic processes.<br />

Most frequently meeting process is erosion of a body of a dam as a result of infiltration of<br />

water on talik in watertight diaphragm. The dam of tailing dump " Nadegdinskoe " is<br />

constructed on first principle of construction with preservation frozen antifiltering screen inside<br />

a body of a dam. Complexity of its structure consists that it is erected directly on a channel<br />

concerning the large river. Through tailing dump " Nadegdinskoe " proceeds r. Burovaja for<br />

which tap of waters have been constructed a line of water-elevating dams. The having hitwater<br />

the pond - sediment bowl - water-turnaround also is used constantly for the purpose economy of<br />

water resources and avoiding of ecological pollution. Water is pumped out by special pumps<br />

from a pond-sediment bowl and leaves back on " Nadegdinskoe " combine.<br />

The hydraulic structure are the most complex engineering objects. The small hydraulic<br />

engineering is characterized as one of the most emergency. For increase of reliability of the<br />

dams providing in quality antifiltering barrier veils - frozen ground the screen, it is necessary<br />

special measures are applied to cooling grounds. Among those it is possible to allocate as<br />

cleaning of a snow into the cold period from a surface of a dam. Most effectual measures would<br />

become at application of special seasonal and all-the-year-round cooling installations special<br />

seasonal deep freezing dams. Has well recommended itself the cementation of fissures.<br />

The hydraulic engineering service of Norilsk mountain combine applies a series of special<br />

meliorative actions which allow to maintain hydraulic engineering objects with a sufficient<br />

degree of reliability. Into structure of such actions enter: cementation of dams, freezing<br />

antifiltering screens the special cooling installations, a regulated alluvium of tail waste products<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!