the water leakage hazard in cold region tunnels.<br />
Key words:The cold region tunnel, Water leakage, Hazard chain, the chain breakage using the<br />
ripped stone<br />
74<br />
Study on the ripped-stone method to the chain breakage of the water<br />
leakage hazard in Kunlun mountain tunnel<br />
Xue-fu Zhang<br />
(1. School of Civil Engineering and Architecture, Chongqing Jiaotong University, Chongqing 400074,<br />
China;2. State Key Laboratory of Frozen Soil Engineering, Cold & Arid Regions Environmental and<br />
Engineering Research Institute, Chinese Academy of Sciences, Gansu Lanzhou 730000,China)<br />
Abstract:The paper whose title is The elementary study on the chain-styled mechanism and the<br />
new-typed method to the chain breakage of the water leakage hazard in Kunlun mountain<br />
tunnel presents a new-typed method,using the ripped stone, to the chain breakage of the water<br />
leakage hazard in cold region tunnels. And the design of the method is shown. But the theoretic<br />
foundation and the feasibility of the method are not analyzed in that paper. In allusion to these<br />
problems, according to the essential theories of heat transfer and seepage, considering the<br />
coupled effects of seepage field and temperature field, a three-dimensional computational<br />
model of the coupled problem is given. The finite element formulae of this problem are<br />
obtained by Galerkin's method. And the computer program of the finite element is written.<br />
Using this model and the computer program, three-dimensional nonlinear analysises for the<br />
coupled problem of seepage field and temperature field of the flat segment DK977+578~<br />
DK977+682 in Kunlun mountain tunnel on Qinghai-Tibet Railway are made under the two<br />
conditions of using the ripped-stone method and not using the ripped-stone method. The results<br />
show that it is feasible that the ripped-stone method is used for breaking the chain of the water<br />
leakage hazard in the permafrost tunnels. So, the theoretic foundation of the ripped-stone<br />
method is provided for its application and design in cold region tunnels.<br />
Key words:The permafrost tunnels, Seepage field, The coupled problem, The chain breakage<br />
using the ripped stone method, Three-dimensional nonlinear analysis.<br />
Analysis of the Combined Effect of Thermal Insulation and<br />
Thermosyphon for Embankment Cooling in Qinghai-Tibet Railway<br />
Ya-hu Tian,Jian-kun Liu<br />
(School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China)<br />
Abstract: The thermosyphon and the thermal insulation layer are widely used in the roadbed<br />
engineering of Qinghai-Tibet railway separately. The measure protecting permafrost using<br />
thermal insulation layer is a passive way, which has limitations. The insulation can prevent<br />
outer thermal energy from penetrating the embankment in warm season, while in cold season it