60<br />

The experience of designing and construction of road water-carrying<br />

metal goffered pipes on the icing places<br />

V.G. Kondratiev, Dementiev A.D.<br />

(JSC “CPE-Ecoterra”)<br />

Abstract: Among set of scientific and technical problems of construction of highways in<br />

cryolithozone the special place is occupied with a problem of a construction of their transitions<br />

through temporary and small water-currents. Until recently it is usual on lots of permafrost and<br />

icings the preference was given construction of small and average bridges. Even in that case<br />

when icings were only assumed, it is frequent without a sufficient substantiation.<br />

Water-carrying pipes were applied only on waterless valleys and is usual in traditional<br />

performance: reinforced-concrete round in diameter 1,5 m from lengthy parts, one-, two-, three-<br />

and four opening or rectangular with an aperture of 2,0 m х 2,0 m. The metal goffered pipes<br />

were applied a little.<br />

In 2003 the situation has cardinally changed, when became obvious, that universal<br />

application of small and average bridges on temporary and small water-currents<br />

Chita-Khabarovsk highway detains rates of construction of a federal highway and not always is<br />

justified technically and economically.<br />

So, absence appropriate geocryological to the information on lots of transitions of a<br />

highway through water-currents with width of a channel 5 and 4 m on lots of a line of km 1008<br />

and km 1020 have led to that originally, from fears of development icings, there were designed<br />

four and three flying bridges in length of 97 and 55 m accordingly. The additional researches<br />

executed by us have allowed to estimate real icing danger on water-currents and to develop<br />

actions on its decrease that has allowed to apply on the specified water-currents more effective<br />

technically and economically decisions with application of the goffered metal tubings of the big<br />

diameter.<br />

In total per 2003-2005 forces of Joint-Stock Company «CPE-Ecoterra» for a<br />

Chita-Khabarovsk highway were designed 138 and 15 water-carrying constructions are<br />

constructed of the metal goffered structures in the form of round pipes in diameter from 1,5 up<br />

to 4,30 m and pipes-arches in width from 1,94 up to 10,72 m, by height from 1,6 up to 7,81 m<br />

and equivalent diameter from 1,72 up to 7,5 m. Length of pipes thus, changed from 21 up to 70<br />

m, a downgrade on a channel - from 0,0006 up to 0,05, thickness of a wall of a pipe - from 2,75<br />

up to 7 mm. The height of embankment above pipes has made from 1,1 up to 16,09 m.<br />

Water-currents had the charge from 1,07 up to 147 м 3 /sec.<br />

In the report saved experience is analyzed and the to a focus is brought to problems of<br />

designing and construction of water-carrying constructions from the metal goffered structures in<br />

neighboring communes of distribution of a permafrost and deep seasonal freezing soils.<br />

Key wods: Frame of Permanent Mai, designing and construction, water-carrying metal,<br />

goffered pipes