15.11.2017 Views

Automotive Exports – November 2017

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Monthly automotive aftermarket magazine<br />

2 nd Zigana Tunnel Longest in<br />

Turkey & Europe, 2 nd in the World<br />

Being under construction, the<br />

New Zigana Tunnel of which<br />

construction launched 1,5 years ago<br />

when completed will feature the longest<br />

tunnel in both Turkey and Europe and<br />

2nd in the world. Until today, totally<br />

8 thousand 807 tons excavation was<br />

fulfilled including both way of the tunnel.<br />

Being built on the highway of Trabzon-<br />

Gumushane connecting Eastern Black<br />

Sea and Caucasians to the Middle East<br />

and Iran, the new Zigana Tunel on<br />

the route of historical Silk Road, the<br />

drilling works are continuing in the<br />

tunnel. Following first Zigana Tunnel’s<br />

groundbreaking which was made 42<br />

years ago and having completed 14<br />

years ago in 1,700 meters length, now<br />

the second tunnel in 29 kilometers<br />

starting Başar village of Macka town of<br />

Trabzon province, the tunnel drilling<br />

works continues in the district of Kostereli<br />

of Torul town of Gumushane province.<br />

Road will shorten 8 km<br />

The 2nd Zigana Tunnel with two ways<br />

each one in 14,5 kilometers length has<br />

been planned to finish 29th October<br />

2019. In the past 1,5 years, having<br />

excavated 30 percent of the tunnel that<br />

will be the longest tunnel of Turkey to<br />

exceed the Ovit Tunnel which is being<br />

built on Rize-Erzurum highway in length.<br />

On the side of Gumushane, 6,554<br />

meters of drilling was made in both<br />

ways, as for Trabzon side, 2,253 meters<br />

of drilling was made in both ways in<br />

the double-way project which will<br />

cost TL580 million. As Totally 8,807<br />

meters drilling works have been made<br />

including both ways, of these 3,241<br />

meters have been covered by cement.<br />

While 400 workers work in both sides<br />

around the clock, in the tunnel natural<br />

airing will be implemented as a different<br />

airing system from Ovit Tunnel. The<br />

groundbreaking ceremony of the tunnel<br />

was made by the participating of Prime<br />

Minister Binali Yildirim 1,5 years ago in<br />

March 2016. When the new Zigana<br />

Tunnel finishes the road from Trabzon<br />

to Gumushane, Bayburt provinces, from<br />

there to Erzurum, Erzincan will shorten<br />

more; a safety and economic transport<br />

opportunity will be provided.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!