Automotive Exports – November 2017
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Monthly automotive aftermarket magazine<br />
2 nd Zigana Tunnel Longest in<br />
Turkey & Europe, 2 nd in the World<br />
Being under construction, the<br />
New Zigana Tunnel of which<br />
construction launched 1,5 years ago<br />
when completed will feature the longest<br />
tunnel in both Turkey and Europe and<br />
2nd in the world. Until today, totally<br />
8 thousand 807 tons excavation was<br />
fulfilled including both way of the tunnel.<br />
Being built on the highway of Trabzon-<br />
Gumushane connecting Eastern Black<br />
Sea and Caucasians to the Middle East<br />
and Iran, the new Zigana Tunel on<br />
the route of historical Silk Road, the<br />
drilling works are continuing in the<br />
tunnel. Following first Zigana Tunnel’s<br />
groundbreaking which was made 42<br />
years ago and having completed 14<br />
years ago in 1,700 meters length, now<br />
the second tunnel in 29 kilometers<br />
starting Başar village of Macka town of<br />
Trabzon province, the tunnel drilling<br />
works continues in the district of Kostereli<br />
of Torul town of Gumushane province.<br />
Road will shorten 8 km<br />
The 2nd Zigana Tunnel with two ways<br />
each one in 14,5 kilometers length has<br />
been planned to finish 29th October<br />
2019. In the past 1,5 years, having<br />
excavated 30 percent of the tunnel that<br />
will be the longest tunnel of Turkey to<br />
exceed the Ovit Tunnel which is being<br />
built on Rize-Erzurum highway in length.<br />
On the side of Gumushane, 6,554<br />
meters of drilling was made in both<br />
ways, as for Trabzon side, 2,253 meters<br />
of drilling was made in both ways in<br />
the double-way project which will<br />
cost TL580 million. As Totally 8,807<br />
meters drilling works have been made<br />
including both ways, of these 3,241<br />
meters have been covered by cement.<br />
While 400 workers work in both sides<br />
around the clock, in the tunnel natural<br />
airing will be implemented as a different<br />
airing system from Ovit Tunnel. The<br />
groundbreaking ceremony of the tunnel<br />
was made by the participating of Prime<br />
Minister Binali Yildirim 1,5 years ago in<br />
March 2016. When the new Zigana<br />
Tunnel finishes the road from Trabzon<br />
to Gumushane, Bayburt provinces, from<br />
there to Erzurum, Erzincan will shorten<br />
more; a safety and economic transport<br />
opportunity will be provided.