Subtotal: 25,000<br />
Total: 1,433,500<br />
Other contingency costs (10%) 143,350<br />
Total investment: 1,576,850€<br />
1,203,702 JOD<br />
*1 JOD=1.31€<br />
In addition, costs for building maintenance will emerge. These costs are estimated to be 3,000 JOD (3,930 €) at an annual basis.<br />
General Objectives of the Project<br />
1. Building a pioneering and realistic model that TBD<br />
achieves the concept of rational energy<br />
consumption and optimal use of RES in ASEZ.<br />
2. Reduce the electricity consumption in the<br />
buildings of the Authority by at least 20% of the<br />
annual consumption rate through energy<br />
conservation programs.<br />
3. Benefit from the presence of parking spaces<br />
and available space to build a solar power<br />
system of 800 kW which will cover part of the<br />
electricity needs of the main building.<br />
4. Build technical capacity and promote the<br />
concept of energy conservation and<br />
environmental conservation in all sectors and<br />
target groups of the project.<br />
Principal partners and stakeholders<br />
Ultimate beneficiaries of the project<br />
1. Aqaba Special Economic Zone Authority.<br />
2. Aqaba Development Company.<br />
3. Electricity Distribution Company.<br />
4. Environmental NGOs in Aqaba.<br />
5. <strong>Jordan</strong> Engineers Association, educational and<br />
media institutions in the city of Aqaba.<br />
6. All institutions and individuals at the local and<br />
national level.<br />
Link to municipal development plans / urban plans / other municipal or<br />
city programs<br />
Not available<br />
Estimated investment cost needed<br />
EUR: 1,576,850<br />
JOD: 1,203,702<br />
2. Technical Description<br />
Area(s) of intervention (sectors as specified in the <strong>SECAP</strong><br />
proposed by CoM)<br />
Main adopted Technology & Equipment<br />