3.2.8 Awareness raising campaigns to reduce the organic content of waste<br />

The next stage of the recycling activities is the effort to reduce the amounts of organic waste<br />

which is a significant source of GHG emissions. <strong>ASEZA</strong> will organize raise awareness campaigns<br />

so that citizens understand the harmful impacts that the discarded food may cause during its<br />

combustion in the landfill. The idea is to inform inhabitants how to separate organic waste<br />

and persuade them to purchase composting bins in order to use their compost product in<br />

domestic cultivation. Alternatively, the ASEZ Authority will install a number of bins in specific<br />

areas to collect the organic waste and transfer them in composting units.<br />

The awareness campaign will include the dissemination of messages through radio,<br />

newspapers and television, especially using local media, launching of promotional material<br />

(leaflets, brochures, posters) and perhaps billboard advertisements. Special events for<br />

schoolchildren will be realized as well.<br />

Table 24: Action 1.8 in numbers<br />

Awareness raising campaigns to reduce the amounts of discarded food (reduction of the<br />

organic content of waste)<br />

Duration 2018 - 2025<br />

Total Implementation Cost (JOD) 200,000<br />

Annual Emission Reduction (tn<br />

164.95<br />

CO 2)<br />

Funding Source<br />

Own funds<br />

Net Present Value (NPV) >0<br />

3.2.9 PVs in <strong>ASEZA</strong> buildings (500 ΚWp)<br />

The solar energy potential for the country and the ASEZ is very high, thus the Authority has to<br />

exploit this opportunity and install PVs to cover a part of <strong>ASEZA</strong> buildings’ electricity<br />

consumption. The ASEZ Authority is planning to utilize the rooftops of its buildings besides<br />

ASEZ main building, so as to install another 500 KW. The produced electricity from Renewable<br />

Energy Sources like sun has zero emissions. Consequently the substitution of electricity<br />

production source with alternative ones will contribute to the CO 2 reduction. Data on the<br />

duration of the action, its cost and related figures on electricity production and CO 2 emissions<br />

reduction are presented in the next table.<br />

Table 25: Action 1.9 in numbers<br />

PVs in <strong>ASEZA</strong> buildings (500 ΚWp)<br />

Duration 2018 - 2025<br />

Total Implementation Cost (JOD) 500,000<br />

Annual Energy Production (MWh) 849.28<br />

Annual Emission Reduction (tn CO 2) 492.81<br />

Funding Source<br />

Own funds, IFIs, Donors<br />

Net Present Value (NPV) >0<br />

3.2.10 Green Municipal Building and Eco Science Park Awareness Raising<br />

The aim of this action is the construction of an Eco-Science Park driven by environmental<br />

obligations and incorporating a variety of demonstrative applications of Renewable Energy<br />

Sources (RES), as well as the construction of a Green Building to house <strong>ASEZA</strong> services and<br />

operate as best practice example, enhancing the living conditions of its employees and the<br />

49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!