161117_Jordan_ASEZA_SECAP_Revised
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Aqaba Special Economic Zone Authority’s (Municipal) buildings 1. Reducing the thermal load of buildings.<br />
2. Modern lighting technology and method of rationalizing<br />
electrical energy.<br />
3. Energy flow monitoring systems.<br />
4. Power generation using solar cell panels through a net<br />
metering system.<br />
Site / Place<br />
Status of the action<br />
Within the limits of Aqaba Special Economic Zone<br />
Authority New Planned Under implementation Following previous action<br />
Start date Project Lifetime Previous or linked studies<br />
TBD 25 years Energy Efficiency through Behavioural Change in Aqaba Special Economic<br />
Zone's Public Buildings<br />
Engineering<br />
Studies<br />
Implementation<br />
plan /<br />
Construction plan<br />
3 months<br />
24 months include:<br />
1. Preparation of a full study which includes the most appropriate means to implement the project, cost<br />
estimations, technical and administrative requirements, duration of implementation and the period of<br />
capital recovery.<br />
2. Comprehensive maintenance program for the central AC system and control of its operation according<br />
to areas and hours of building occupancy, summer and winter AC loads and periodic maintenance<br />
programs.<br />
3. Training and qualifying for <strong>ASEZA</strong> teamwork staff.<br />
4. Replacement of all traditional lighting units used in <strong>ASEZA</strong> main building (such as halogen, tungsten,<br />
metal halide, fluorescent) with LED lighting units of higher efficiency and quality so as to save more than<br />
40% of the total lighting consumption.<br />
5. Use lighting control systems where necessary (motion detectors, digital timers, opacity systems..).<br />
6. Shading all sky-light areas in the main building to reduce the increase in convection and increase the<br />
efficiency of central air conditioners.<br />
7. Installation of intelligent digital thermostats to determine the appropriate temperature for AC operation<br />
and reduction of the human factor’s presence impact in order to ensure optimal operation of the cables<br />
and reduce the loads of air conditioning at rates of not less than (10%).<br />
8. Establishment of a centralized system to monitor the electrical loads of the main <strong>ASEZA</strong> building, analyze<br />
the flow of energy up to date and determine the means of rationalization of consumption and<br />
application according to the data received from the system.<br />
9. Building an 800 kW solar power system to secure a part of the building's actual energy needs, taking<br />
advantage of parking spaces and building surfaces to secure space.<br />
10. Mainstream and disseminate a culture of energy conservation among the Authority's employees from<br />
the beginning, and expand to all sectors and target groups.<br />
Other previous Not available<br />
studies<br />
Environmental Energy Efficiency through behavioural Change in Aqaba Special Economic Zone's Public Buildings<br />
impact<br />
assessment<br />
3. Organization and procedures<br />
Formal approval<br />
Legal responsible body<br />
In process 1. Aqaba Special Zone Authority.<br />
136