29.11.2017 Views

161117_Jordan_ASEZA_SECAP_Revised

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Action<br />

Energy Savings<br />

(MWh)<br />

Energy<br />

production<br />

(MWh)<br />

Emission<br />

Reduction (tn)<br />

Municipal fleet<br />

Private & Commercial Transport<br />

Public transport<br />

Local Renewable<br />

Energy<br />

Production<br />

4.11 External shading installation 2,936.99 1,704.24<br />

4.12<br />

4.13<br />

5.1<br />

5.2<br />

5.3<br />

5.4<br />

5.5<br />

5.6<br />

5.7<br />

5.8<br />

5.9<br />

5.10<br />

5.11<br />

Awareness raising campaigns for pupils/<br />

students<br />

The 10% voluntary campaign for energy<br />

reduction in schools<br />

Total<br />

Replacement of the existing <strong>ASEZA</strong> vehicles<br />

with new. more efficient vehicles (hybrid<br />

etc.) & plan to purchase only efficient<br />

vehicles in the future<br />

Installation of tracking and monitoring<br />

system for more efficient management of<br />

the fleet and better planning routes<br />

<strong>ASEZA</strong> fleet maintenance (for the existing<br />

& the new ones)<br />

Eco-driving seminars for the drivers of the<br />

<strong>ASEZA</strong> fleet<br />

Information events on the new vehicle<br />

technologies<br />

Replacement of gasoline vehicles with<br />

Hybrid<br />

Replacement of diesel vehicles with new<br />

more efficient<br />

Improve public transportation/ promote<br />

the use of public transport<br />

Cycling promotion and creation of related<br />

infrastructure<br />

Promotion of walking and car sharing and<br />

car pooling campaigns<br />

Improvement / development of parking<br />

infrastructure<br />

59,356.71 (14%)<br />

145,247.52 (40%)<br />

126.39 73.34<br />

544.86 316.16<br />

18,444.77<br />

(14%)<br />

26,937.59<br />

(40%)<br />

45,145.55 (14%)<br />

99,913.10 (40%)<br />

998.82 477.37<br />

289.01 128.82<br />

572.64 150.96<br />

1,332.53 351.28<br />

1,640.04 432.34<br />

Total 4,833.05 0.00 1,540.76<br />

0.00 0.00<br />

2,935.51 730.94<br />

5,146.75 1,374.18<br />

4,892.51 1,218.24<br />

2,935.51 730.94<br />

4,109.71 1,023.32<br />

4,403.26 1,096.41<br />

5.12 Promotion of eco-driving 10,659.80 2,793.25<br />

5.13<br />

Replacement of gasoline vehicles with<br />

electric ones<br />

5.14 Transportation master plan<br />

5.15<br />

5.16<br />

5.17<br />

5.18<br />

5.19<br />

546.65 136.12<br />

Total 35,083.05 546.65 9,103.40<br />

Promotion of eco-driving for public<br />

transport's drivers<br />

5,320.93 1,325.60<br />

Promotion of new technology buses in the<br />

public transportation<br />

9.51 2.54<br />

Installing track and monitoring system in<br />

public transportation<br />

11,078.17 2,758.70<br />

Replacing the existing Taxi vehicles with<br />

Hybrid vehicles<br />

31,192.00 7,767.00<br />

Installing Solar systems on the buses<br />

related to Aqaba Company for<br />

12.85 3.20<br />

transportation and logistics'(coach buses)<br />

Total 47,600.61 12.85 11,857.04<br />

Total transportation 87,516.71 559.50 22,501.19<br />

6.1 10 MW PVs in southern ports 16,985.64 9,856.19<br />

6.2 5 MW PVs in <strong>ASEZA</strong> main building 8,492.82 4,928.09<br />

6.3 1 MW PVs in the north of Aqaba 1,698.56 985.62<br />

16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!