(MWh/a)<br />
(MWh/a)<br />
2,487 1,359<br />
CO 2 Reduction (tn CO 2/a)<br />
Target Year 2030<br />
Net reduction on the Territory 2,231 tn CO 2<br />
Reduction as related to BAU Scenario 0.37%<br />
Per Capita calculated reduction<br />
7. Summary of Related Awareness Raising (AR) Actions<br />
18.91 kg/capita<br />
Awareness Raising related to the Action<br />
1. Awareness raising procedures related to the project<br />
2. The launch ceremony includes all target sectors.<br />
3. Holding specialized workshops that summarize the stages of the project and its outputs and include all the main sectors<br />
benefiting from the project.<br />
Awareness raising related to the Community<br />
1. Develop educational brochures and posters and distribute them to target groups.<br />
2. Holding public workshops in cooperation with the educational institutions, <strong>Jordan</strong> Engineers Association, and media<br />
organizations in the city of Aqaba to communicate with all segments of society.<br />
3. Launch a scientific and cultural competition for school and university students to develop knowledge about project<br />
objectives.<br />
8. Assumptions and risks<br />
1. Issuing approvals by financiers for the required amounts within the specified time frame.<br />
2. The administrative gap between the team members and the number of responsible departments.<br />
3. The team needs to develop some technical aspects of team members due to the lack of similar experiences.<br />
4. The solar power generation system is linked to the approval of Energy & Minerals Regulatory Commission (EMRC) and the<br />
Electricity Distribution Company (EDCO) and the need to implement the relevant procedures.<br />
9. Key Success Factors<br />
1. Full responsibility for the implementation of the project is limited to Aqaba Special Economic Zone Authority.<br />
2. Provide the necessary information and data required for the success of the project in the team.<br />
3. Great congruence with the pattern of electric power consumption within power buildings and other government buildings.<br />
4. Availability of qualified staff in the Authority capable of prioritizing, analyzing data and implementing the project.<br />
10. Next Steps<br />
TBD<br />
11. Annexes / References to Annexes<br />
Not available<br />