investors regarding the next projects: A wind farm (50 MW), 10 MW PVs in the southern new<br />

ports, 5 MW PVs in <strong>ASEZA</strong> main building (which will be a fixed or a movable system), 1 MW<br />

PVs in the north of Aqaba (private), 1 MW PVs in the solar power plant with dual power<br />

generation technologies (bio gas from waste water treatment and solar energy) and finally 0.1<br />

MW PVs in the marine visitors center. In the next table figures about the respective electricity<br />

production and CO 2 reduction are presented.<br />

Table 76: RES projects<br />

Electricity Production<br />

(MWh)<br />

Emission Reduction<br />

(tn CO 2)<br />

10 MW PVs in southern ports 16.985,64 9.856,19<br />

5 MW PVs in <strong>ASEZA</strong> main<br />

8.492,82 4.928,09<br />

building<br />

1 MW PVs in the north of<br />

1.698,56 985,62<br />

Aqaba<br />

1 MW PVs in solar power plant 1.698,56 985,62<br />

0.1 MW PVs in the marine<br />

170,00 98,65<br />

visitors center<br />

Total 29.045,59 16.854,17<br />

The wind farm has not been included in <strong>SECAP</strong> calculations since, according to the CoM<br />

Guidelines, the plant/unit should be below or equal to 20 MW. [5]<br />

3.8 Actions’ Overview<br />

In the next table the complete list of the <strong>SECAP</strong> Actions is presented followed by the<br />

respective energy savings/production and the CO2 reduction.<br />

Municipal buildings<br />

1.1<br />

1.2<br />

1.3<br />

1.4<br />

1.5<br />

Action<br />

Energy Savings<br />

(MWh)<br />

Energy<br />

production<br />

(MWh)<br />

Emission<br />

Reduction (tn)<br />

Green procurement procedures<br />

for <strong>ASEZA</strong> buildings 1,145.96 664.96<br />

Improving energy efficiency in 2,622.42 (14%) 1,521.70 (14%)<br />

<strong>ASEZA</strong> buildings<br />

3,746.32 (40%) 2,173.86 (40%)<br />

Energy Upgrade and RES in <strong>ASEZA</strong><br />

main building 2,487.00 1,359.00 2,231.70<br />

Energy manager appointment in<br />

<strong>ASEZA</strong> 64.02 37.15<br />

Awareness raising activities for<br />

<strong>ASEZA</strong> employees 204.86 118.88<br />

1.6<br />

Adoption of bioclimatic principles<br />

in <strong>ASEZA</strong> buildings /Strict<br />

1,264.40 (14%) 733.69 (14%)<br />

application of green building<br />

codes in <strong>ASEZA</strong> buildings<br />

4,046.06 (40%) 2,347.79 (40%)<br />

1.7 Promotion of recycling 824.76<br />

1.8<br />

Awareness raising campaigns to<br />

reduce the organic content of<br />

waste)<br />

164.95<br />

76