171117_SECAP of Greater Irbid Municipality_SET_rev2
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
- The Risks:<br />
o Implementation without developing measures and technical specifications for the Public Street;<br />
o Non-availability <strong>of</strong> the recycling programme for replacement <strong>of</strong> HPS with efficient LED lamps;<br />
o Low product quality and maintenance.<br />
Key success factors<br />
- The successful stories for LED implementation in the city;<br />
- The reduction on cost for energy consumption would bring more finance to the city.<br />
Next steps<br />
- Looking for finance to start developing the actions<br />
Projected Energy Estimates in<br />
2030<br />
Cost <strong>of</strong> Implementation Available and foreseen sources <strong>of</strong> funding<br />
Mitigation All cost 16,129,370<br />
Local authority's own 20%<br />
resources<br />
MWh/a t CO2/a<br />
Initial and start-up 367770 JOD National Funds and<br />
10%<br />
expenses<br />
Programmes<br />
Approximate<br />
To be<br />
70%<br />
22,835 14,820<br />
maintenance<br />
operational Costs developed International<br />
(including<br />
Financial Institutions<br />
Per capita calculated reduction<br />
MWh/c<br />
t CO2/c<br />
0.0274 0.0178<br />
Contribution for<br />
Area <strong>of</strong> intervention<br />
Policy Instrument<br />
Reduction as<br />
related to<br />
BAU scenario<br />
Approximate annual<br />
income for energy<br />
producing projects<br />
Draft calculation <strong>of</strong><br />
the NPV.<br />
Key performance<br />
Indicator<br />
Measurement Units<br />
JOD (0.146<br />
JOD/Kwh)<br />
JOD<br />
26,882,216<br />
Energy<br />
consumption<br />
KWh/a<br />
EU Funds &<br />
Programmes and<br />
other external funds<br />
Public-Private<br />
Partnerships<br />
amount/share<br />
(available or to raise)<br />
Lined up private<br />
investments<br />
Loans and potential<br />
borrower<br />
0,96% Years <strong>of</strong> Implementation<br />
Expected annual cost<br />
savings to the City<br />
budget<br />
1 2 3 4 5 6 7 8 9 10 Other<br />
Organisation and procedures<br />
Energy Efficiency<br />
LA H<br />
Energy Management<br />
Involvement<br />
<strong>of</strong> Stake<br />
Holders<br />
External<br />
Origin <strong>of</strong> action LA Other H<br />
Staff Capacity<br />
L M H Technical assistance needs<br />
Person in charge<br />
Head <strong>of</strong> Electrical and<br />
street lighting department<br />
<strong>Greater</strong> <strong>Irbid</strong> <strong>Municipality</strong><br />
Person in charge Lighting Consultant Consultant <strong>of</strong>fice<br />
H<br />
3481370 JOD<br />
(0.146 JOD/Kwh)<br />
<strong>Municipality</strong> <strong>of</strong> <strong>Greater</strong> <strong>Irbid</strong> /<br />
Electricity Sector Regulatory<br />
Commission / Electricity<br />
Company / Company assigned<br />
to tender implementation<br />
138