171117_SECAP of Greater Irbid Municipality_SET_rev2
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Summary <strong>of</strong> actions<br />
Sectoral & field <strong>of</strong><br />
action<br />
Action NO.<br />
Key actions and Measures BAU Scenario Mitigation in Energy Mitigation<br />
in %<br />
MWh/a t CO2/a MWh/a t CO2/a<br />
MUNICIPAL BUILDINGS, EQUIPMENT/FACILITIES 2,389 1,440 1,480 1021.2 71%<br />
1.0 Transition Municipal work from traditional management to electronic management 1434 357 24.8%<br />
1.1 Automate <strong>Municipality</strong> and transfer all municipal and paper-based information to electronic<br />
information.<br />
1.2 Securing the necessary infrastructure to connect all Municipal departments with a single information<br />
network and exchange <strong>of</strong> information between different departments.<br />
1.3 Determine all transactions between the citizen and municipal departments and convert them into<br />
electronic transactions.<br />
Main Municipal Building 760 493<br />
2.0 Transforming the municipal building into an environmental landmark - Publish energy conservation<br />
measures in Municipal building<br />
2.1 Switch Off lights after leaving the premises 25 16 1%<br />
2.2 More reliance on natural lighting 25 16 1%<br />
2.3 Apply green <strong>of</strong>fice procedures 4.2 2.7 0%<br />
2.4 Thermometer calendars 25 27 2%<br />
3.0 Installing eyebrow to the windows (Sun shade) 25 27 2%<br />
4.0 Design, calculate and visualize light pr<strong>of</strong>essionally with new efficient lights 197 128 9%<br />
5.0 Installing heat insulation on the external wall <strong>of</strong> the building 291 78 87 23 2%<br />
6.0 Periodic maintenance <strong>of</strong> equipment 105 68 5%<br />
Other Municipal buildings and facilities 0%<br />
7.0 Publish energy conservation measures in other Municipal building 1,338 869<br />
7.1 Switch Off lights after leaving the premises 44 28 2%<br />
88