- Page 1 and 2:
This project is funded by the Europ
- Page 3 and 4:
Sustainable Energy and Climate Acti
- Page 5 and 6:
Sustainable Public Procurement ....
- Page 7 and 8:
Acknowledgements This report has be
- Page 9 and 10:
Section I: SECAP Executive Summary
- Page 11 and 12:
- Design, calculate and visualize l
- Page 13 and 14:
4. Public Lighting Setting street l
- Page 15 and 16:
‣ Constructing a multi-storey par
- Page 17 and 18:
- Modification of crop calendar inc
- Page 19 and 20:
agreement. The agreement will come
- Page 21 and 22:
once the pavement is severely damag
- Page 23 and 24:
Complementary with the national act
- Page 25 and 26:
The Communication Awareness Promoti
- Page 27 and 28:
- Interview with data resources emp
- Page 29 and 30:
1 8 15 22 29 36 43 50 57 64 71 78 8
- Page 31 and 32:
Agriculture Communication Universit
- Page 33 and 34:
By applying the new technology in t
- Page 35 and 36:
12% 0% 0% 0% Municipal Tertiary 0%
- Page 37 and 38:
Section IV: Sustainable Energy Acti
- Page 39 and 40:
Benefits of e-management: - Quick i
- Page 41 and 42:
1. Applying the energy saving metho
- Page 43 and 44:
Thus, the aforementioned measures w
- Page 45 and 46:
- Setting the temperature cooling u
- Page 47 and 48:
Sustainable Public Procurement Back
- Page 49 and 50:
Summary of actions related to Munic
- Page 51 and 52:
Residential buildings Implementing
- Page 53 and 54:
Initiatives towards existing buildi
- Page 55 and 56:
Awareness campaigns to reduce energ
- Page 57 and 58:
Energy consumption analysis and beh
- Page 59 and 60:
13.15 Following-up the SWHs’ inst
- Page 61 and 62:
General objectives The objectives o
- Page 63 and 64:
- Holding awareness campaigns throu
- Page 65 and 66:
Summary of actions in the Tertiary
- Page 67 and 68:
Below is an explanation of the expe
- Page 69 and 70:
The following are actions related t
- Page 71 and 72:
Transport Complex East of Irbid. Ba
- Page 73 and 74:
• Flashing overhead at crossing s
- Page 75 and 76:
Shuttle bus / Express bus. Backgrou
- Page 77 and 78:
Intelligent and Smart Control of Tr
- Page 79 and 80:
Light Train Project. Background The
- Page 81 and 82:
Constructing a Multi-Storey Parking
- Page 83 and 84:
Summary or actions in the Transport
- Page 85 and 86:
Description 2018 2019 2020 2021 202
- Page 87 and 88:
Average distance travelling per Veh
- Page 89 and 90:
Local Electricity Production Establ
- Page 91:
Summary of actions Sectoral & field
- Page 95:
12.7 Issuing certificates for build
- Page 99:
17.0 Awareness campaigns to reduce
- Page 103:
Local Renewable energy generation 3
- Page 106 and 107:
The increase of the projected tempe
- Page 108 and 109:
The national strategy, its goals an
- Page 110 and 111:
Section B: Climate Change Risk Asse
- Page 112 and 113: Built Environment Economy Biodivers
- Page 114 and 115: Reorganize the working hours and to
- Page 116 and 117: communities, the exposure has been
- Page 118 and 119: - Seehan community will suffer an i
- Page 120 and 121: Section VI: Citizens Awareness Prom
- Page 122 and 123: Aim Preparation of a COMMUNITY AWAR
- Page 124 and 125: Situation analysis From this study
- Page 126 and 127: Insufficient water supply Solid Was
- Page 128 and 129: - Promote the use of similar equipm
- Page 130 and 131: Recommendations: These tables have
- Page 132 and 133: The action framework is obtained fr
- Page 134 and 135: Technical description - Main Techno
- Page 136 and 137: - A permit for the establishment of
- Page 138 and 139: Annex for Priority action 1 STAGE 1
- Page 140 and 141: especially those that will impact p
- Page 142 and 143: 20. Transportation analysis as nece
- Page 144 and 145: - Energy yield analysis. o Losses a
- Page 146 and 147: The annual consumptions with LED la
- Page 148 and 149: - The Risks: o Implementation witho
- Page 150 and 151: accurate and correct information as
- Page 152 and 153: Projected Energy Estimates in 2030
- Page 154 and 155: 10. Increased Service and Brand Ima
- Page 156 and 157: For the sake of argument, let's ass
- Page 158 and 159: - Marketing and communication mater
- Page 160 and 161: Projected Energy Estimates in Avail