Local Electricity Production<br />
Establishment <strong>of</strong> a 16 MW Solar/Photovoltaic Cell Station<br />
Background<br />
Jordan bears the highest financial cost to support the internally displaced people<br />
whose number reached 1.4 million. This has created financial and economic burden<br />
on the local community that has contributed to the displaced people, leading to an<br />
increase in its expenditures and inadequacy <strong>of</strong> the previous development plan due<br />
to the sudden and steady population growth. This addresses a higher need to the<br />
increased development projects and infrastructure investments resulting from the<br />
excessive use and the inability to cover all the needs in the near future.<br />
As a result, the demand for electricity has largely increased because <strong>of</strong> population<br />
increase and growth which is significantly accompanied by the governmental<br />
subsidies <strong>of</strong> the electricity prices, amounting to more than JOD 1.9 billion. The<br />
National Electric Power Company is facing a loss <strong>of</strong> 53 piasters for every dinar <strong>of</strong><br />
electricity consumed in the Kingdom, on which the government subsidizes 1.9 billion<br />
dinars annually.<br />
Because <strong>of</strong> population increase and migration from neighbouring countries such as<br />
Syria - Iraq - Yemen - Libya ... etc., <strong>Greater</strong> <strong>Irbid</strong> <strong>Municipality</strong> suffers greatly from the<br />
burden on its energy bill, an increase that reached JOD 4 million per year due to the<br />
rising prices for the fuels used and expansion <strong>of</strong> the <strong>Greater</strong> <strong>Irbid</strong> <strong>Municipality</strong><br />
organizational area. The increase in energy consumption is attributed to the need for<br />
additional services, which are steadily growing; thus, reducing energy expenditure,<br />
diversifying its sources and reducing harmful emissions are required.<br />
Description <strong>of</strong> the action<br />
Establishing a power station using the best solar cell systems on a 500 dunum plot <strong>of</strong><br />
land located in the village <strong>of</strong> Al-Khanasri. The village is characterized by high<br />
brightness and technical appropriateness for the establishment <strong>of</strong> this station, where<br />
the electricity will be transferred through national electricity grid, knowing that:<br />
Mitigation<br />
MWh/a t CO2/a<br />
31,162 20,221<br />
Contribution for<br />
1.26%<br />
Cost <strong>of</strong> Implementation<br />
12,100,000 JOD<br />
Involvement<br />
<strong>of</strong> Stake<br />
Holders<br />
Staff<br />
Capacity<br />
- A permit for the establishment <strong>of</strong> a 16 MW solar power plant has been obtained<br />
and approved by the Ministry <strong>of</strong> Environment, Ministry <strong>of</strong> Energy and Mineral Resources, Ministry <strong>of</strong> Municipal Affairs,<br />
Electricity Regulatory Commission, and the Electric Power Company;<br />
- The approval for transmitting the generated electricity through its grid has been obtained by the National Electricity<br />
Power Industry;<br />
- An actuarial study <strong>of</strong> the energy bill for 2017 has been made;<br />
- The <strong>Municipality</strong> will train skilled personnel on the maintenance and continuity <strong>of</strong> the station.<br />
LA<br />
External<br />
H<br />
M<br />
Other<br />
L M H<br />
Years <strong>of</strong> Implementation<br />
Key performance Indicator<br />
RE produced<br />
Measurement Units<br />
In KWh<br />
Area <strong>of</strong> intervention<br />
Photovoltaics<br />
Policy Instrument<br />
Energy suppliers obligations<br />
Origin <strong>of</strong> action<br />
LA<br />
Priority <strong>of</strong> action<br />
Action<br />
2018<br />
2019<br />
2020<br />
2021<br />
2022<br />
2023<br />
2024<br />
2025<br />
2026<br />
2027<br />
2028<br />
2029<br />
Establishment <strong>of</strong> the first phase <strong>of</strong> the station 4 MW<br />
Establishment <strong>of</strong> the second phase <strong>of</strong> the station 4 MW<br />
Construction <strong>of</strong> the third phase <strong>of</strong> the station 4 MW<br />
Establishment <strong>of</strong> the fourth phase <strong>of</strong> the station 4 MW<br />
Awareness campaigns to reduce energy consumption<br />
General objectives<br />
1. Reducing CO2 emissions;<br />
2. Reducing the energy bill that reaches about JOD 4 million annually;<br />
3. Using renewable energy sources and environmentally friendly clean energy;<br />
86