Local Electricity Production<br />

Establishment <strong>of</strong> a 16 MW Solar/Photovoltaic Cell Station<br />

Background<br />

Jordan bears the highest financial cost to support the internally displaced people<br />

whose number reached 1.4 million. This has created financial and economic burden<br />

on the local community that has contributed to the displaced people, leading to an<br />

increase in its expenditures and inadequacy <strong>of</strong> the previous development plan due<br />

to the sudden and steady population growth. This addresses a higher need to the<br />

increased development projects and infrastructure investments resulting from the<br />

excessive use and the inability to cover all the needs in the near future.<br />

As a result, the demand for electricity has largely increased because <strong>of</strong> population<br />

increase and growth which is significantly accompanied by the governmental<br />

subsidies <strong>of</strong> the electricity prices, amounting to more than JOD 1.9 billion. The<br />

National Electric Power Company is facing a loss <strong>of</strong> 53 piasters for every dinar <strong>of</strong><br />

electricity consumed in the Kingdom, on which the government subsidizes 1.9 billion<br />

dinars annually.<br />

Because <strong>of</strong> population increase and migration from neighbouring countries such as<br />

Syria - Iraq - Yemen - Libya ... etc., <strong>Greater</strong> <strong>Irbid</strong> <strong>Municipality</strong> suffers greatly from the<br />

burden on its energy bill, an increase that reached JOD 4 million per year due to the<br />

rising prices for the fuels used and expansion <strong>of</strong> the <strong>Greater</strong> <strong>Irbid</strong> <strong>Municipality</strong><br />

organizational area. The increase in energy consumption is attributed to the need for<br />

additional services, which are steadily growing; thus, reducing energy expenditure,<br />

diversifying its sources and reducing harmful emissions are required.<br />

Description <strong>of</strong> the action<br />

Establishing a power station using the best solar cell systems on a 500 dunum plot <strong>of</strong><br />

land located in the village <strong>of</strong> Al-Khanasri. The village is characterized by high<br />

brightness and technical appropriateness for the establishment <strong>of</strong> this station, where<br />

the electricity will be transferred through national electricity grid, knowing that:<br />

Mitigation<br />

MWh/a t CO2/a<br />

31,162 20,221<br />

Contribution for<br />

1.26%<br />

Cost <strong>of</strong> Implementation<br />

12,100,000 JOD<br />

Involvement<br />

<strong>of</strong> Stake<br />

Holders<br />

Staff<br />

Capacity<br />

- A permit for the establishment <strong>of</strong> a 16 MW solar power plant has been obtained<br />

and approved by the Ministry <strong>of</strong> Environment, Ministry <strong>of</strong> Energy and Mineral Resources, Ministry <strong>of</strong> Municipal Affairs,<br />

Electricity Regulatory Commission, and the Electric Power Company;<br />

- The approval for transmitting the generated electricity through its grid has been obtained by the National Electricity<br />

Power Industry;<br />

- An actuarial study <strong>of</strong> the energy bill for 2017 has been made;<br />

- The <strong>Municipality</strong> will train skilled personnel on the maintenance and continuity <strong>of</strong> the station.<br />

LA<br />

External<br />

H<br />

M<br />

Other<br />

L M H<br />

Years <strong>of</strong> Implementation<br />

Key performance Indicator<br />

RE produced<br />

Measurement Units<br />

In KWh<br />

Area <strong>of</strong> intervention<br />

Photovoltaics<br />

Policy Instrument<br />

Energy suppliers obligations<br />

Origin <strong>of</strong> action<br />

LA<br />

Priority <strong>of</strong> action<br />

Action<br />

2018<br />

2019<br />

2020<br />

2021<br />

2022<br />

2023<br />

2024<br />

2025<br />

2026<br />

2027<br />

2028<br />

2029<br />

Establishment <strong>of</strong> the first phase <strong>of</strong> the station 4 MW<br />

Establishment <strong>of</strong> the second phase <strong>of</strong> the station 4 MW<br />

Construction <strong>of</strong> the third phase <strong>of</strong> the station 4 MW<br />

Establishment <strong>of</strong> the fourth phase <strong>of</strong> the station 4 MW<br />

Awareness campaigns to reduce energy consumption<br />

General objectives<br />

1. Reducing CO2 emissions;<br />

2. Reducing the energy bill that reaches about JOD 4 million annually;<br />

3. Using renewable energy sources and environmentally friendly clean energy;<br />