171117_SECAP of Greater Irbid Municipality_SET_rev2
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Solid Waste Management<br />
Updating the Solid Waste Management, Collection and<br />
Transportation<br />
Background<br />
Some important recommendations have been made through the Master Plan for<br />
Municipal Solid Waste in the <strong>Greater</strong> <strong>Irbid</strong> <strong>Municipality</strong>.<br />
It is currently possible to improve the performance <strong>of</strong> waste collection in anticipation<br />
<strong>of</strong> the governmental strategic plan through the elaboration <strong>of</strong> the following tasks.<br />
Institutional/Organizational<br />
- Written procedures, description <strong>of</strong> tasks, and thus assessment <strong>of</strong> staff<br />
performance, specific routes for waste collection and transport, container<br />
locations, electronic data processing, and monitoring and evaluation <strong>of</strong> data;<br />
- Increased level <strong>of</strong> knowledge and skills <strong>of</strong> employees and training;<br />
- Identification <strong>of</strong> clear lines <strong>of</strong> responsibility <strong>of</strong> the staff concerned between<br />
administrations and informal departments;<br />
- A mentorship program for newly appointed municipal staff and written<br />
procedures to assess staff performance;<br />
- The current 23-sector waste collection and transport organization should be<br />
reviewed to provide services in a cost-effective manner.<br />
Solid Waste Collection Routes and Container Locations<br />
- Maps should be available for the collection and transport <strong>of</strong> wastes with their<br />
routes and container locations;<br />
- The container location should be planned;<br />
- The optimal movement <strong>of</strong> waste collection and data optimization should be<br />
assessed.<br />
Mitigation<br />
MWh/a t CO2/a<br />
6,663 1,779<br />
Contribution for<br />
30%<br />
Cost <strong>of</strong> Implementation<br />
20,000 JOD<br />
Involvement<br />
<strong>of</strong> Stake<br />
Holders<br />
Staff<br />
Capacity<br />
LA<br />
External<br />
H<br />
M<br />
Other<br />
L M H<br />
Years <strong>of</strong> Implementation<br />
Key performance Indicator<br />
Cost <strong>of</strong> operation<br />
Measurement Units<br />
In JOD<br />
Area <strong>of</strong> intervention<br />
Waste & wastewater<br />
management<br />
Policy Instrument<br />
Awareness raising / training<br />
Origin <strong>of</strong> action<br />
LA<br />
Priority <strong>of</strong> action<br />
Maintenance and Repair<br />
- Schedule a technical inspection <strong>of</strong> vehicles and equipment;<br />
- Solid waste is collected by mechanisms from different sources, and therefore many spare parts must be purchased, a<br />
task that takes time and additional cost.<br />
The cost <strong>of</strong> collection and transportation<br />
<strong>Greater</strong> <strong>Irbid</strong> <strong>Municipality</strong> collects more than 600 tons <strong>of</strong> waste per day that is steadily increasing as a result <strong>of</strong> the<br />
continuously increasing population, affecting the proportion <strong>of</strong> organic materials (67%) and inorganic recyclable ones (33%,<br />
comprising <strong>of</strong> plastic, glass, metal etc.). The municipality transports these wastes to the landfill, which is about 35 km away<br />
from it, thereby costing about JOD 40 per day per ton, amounting at an annual total cost <strong>of</strong> about JOD 8,760,000. This<br />
includes the annual cost <strong>of</strong> fuel consumption for waste transportation that reaches JOD 700,000.<br />
Summary <strong>of</strong> Garbage Fleet<br />
- Garbage vehicles 35 1Km/l<br />
- Garbage vehicles 20 1.5Km/l<br />
- Garbage vehicles 21 2Km/l<br />
- Average consumption Garbage vehicles 76 1.4Km/l<br />
Total distance for municipality’s roads in Km 165,000<br />
Annual distance travelled<br />
81,600 Km/a<br />
Number <strong>of</strong> trips per month 2,400<br />
83