16.12.2012 Views

PMR cover.psd - ppiaf

PMR cover.psd - ppiaf

PMR cover.psd - ppiaf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

April 2012<br />

Activities Approved in Q1-Q3 of FY2012, Classified in Accordance with PPIAF’s<br />

Work Program 2011–2013<br />

The table below contains the activities approved during the first three quarters of fiscal 2012, classified in<br />

accordance with the three strategic pillars and four cross-cutting themes of PPIAF’s 2011–2013 Work<br />

Program.<br />

Pillar #1 Pillar #2 Pillar #3<br />

Sectors Universal Access Climate Change Urbanization<br />

Power<br />

Water<br />

� Burundi Pipeline Screening and<br />

Feasibility Assessment of PPPs<br />

in the Energy Sector<br />

� Djibouti Energy Sector<br />

Assessment<br />

� Lighting Africa Expansion<br />

� Mozambique Preparation of a<br />

Gas Sector Master Plan<br />

� Niger Evaluation of Rural<br />

Energy Projects with Private<br />

Sector Participation (PSP)<br />

� Nigeria Support for PSP in the<br />

Power Sector<br />

� South Sudan Power Distribution<br />

System Diagnostic<br />

� Armenia Supporting an<br />

Enhanced Management<br />

Contract for Water and<br />

Sanitation Services<br />

� Cameroon Support to Water<br />

Sector<br />

� Lebanon Improving Water Utility<br />

Performance<br />

� Maldives Contract Management<br />

Support for Solid Waste<br />

Management PPP<br />

� Nigeria Workshop on Water<br />

Utility Reform<br />

� Panama Preparation of a<br />

Performance-Based Efficiency<br />

Improvement Contract for<br />

IDAAN’s Colón Business Unit<br />

� West Bank and Gaza Solid<br />

Waste Management Project<br />

� Albania Technical<br />

Assessments of Bistrica 1,<br />

Bistrica 2, Ulza, and<br />

Shkopeti Hydropower Plants<br />

� Brazil Improving the<br />

Sustainable Forestry<br />

Concession Model in the<br />

Amazon<br />

� Djibouti Feasibility<br />

Assessment for Solar Rural<br />

Electrification<br />

� Kenya Lake Turkana Wind<br />

Due Diligence Project<br />

� Mali Capacity Building and<br />

Legal Advisory Support to<br />

the Scatec and Kenie<br />

Projects<br />

� Colombia Private Financing<br />

for Low-Income Housing<br />

Projects<br />

� Ghana Institutional Options<br />

for Improving Urban Water<br />

Supply

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!