planned activities, and facilitate the bid process to appoint project consultants for implementing such<br />
projects. Implementation of the activity is still ongoing.<br />
Results of PPP Options Study for Wastewater Management in Delhi Jal Board<br />
Outputs Outcomes<br />
Enabling environment reform<br />
Analyses/assessments prepared<br />
� Delhi Jal Board Wastewater Management<br />
PPP Options Study, 2011<br />
Capacity and awareness building<br />
Workshops/seminars<br />
� Stakeholder workshops to present the<br />
findings of the PPP options report, June 8,<br />
2011<br />
Technical capacity enhanced<br />
� Technical capacity of the Delhi Jal Board<br />
enhanced, 2011<br />
7. India: Review and Analysis of the Proposed Regulatory Framework for the Ports and Airports<br />
Sectors in India ($65,000): approved on August 4, 2010, this activity helped the government of India<br />
review and analyze i) the draft Major Ports Regulatory Authority Act and ii) the consultation paper<br />
―Regulatory Philosophy and Approach in Economic Regulation of Airports and Air Navigation Services,‖<br />
circulated by the Airport Economic Regulatory Authority to ensure they are consistent with international<br />
best practice, appropriately adapted to the local context as well as market realities after the global<br />
financial crisis, and directed towards ensuring efficient, competitive, and effective operation of the ports<br />
and airports sectors.<br />
Results of Analysis of Proposed Regulatory Framework for Ports and Airports<br />
Outputs Outcomes<br />
Enabling environment reform Capacity and awareness building<br />
Analyses/assessments prepared<br />
� Regulation of Indian Port Sector report,<br />
2011<br />
� Assessment of the Regulatory Philosophy of<br />
Airports Economic Regulatory Authority of<br />
India, 2011<br />
Technical capacity enhanced<br />
� Technical capacity of the Ministry of Roads,<br />
Transport, and Highways enhanced, 2011<br />
� Technical capacity of the Airport Economic<br />
Regulatory Authority enhanced, 2011<br />
8. Azerbaijan: National Solid Waste Management Performance Improvement and Private Sector<br />
Participation Strategy ($74,950): approved on December 6, 2010, this activity aims to assist the<br />
government of Azerbaijan in developing a national strategy for integrated solid waste management. The<br />
PPIAF-funded work is envisaged to provide policy recommendations for improving solid waste<br />
management infrastructure, service levels, and financial sustainability through various options, including<br />
private sector participation. Implementation of the activity is still ongoing.<br />
9. Morocco: PPP Unit Support ($245,700): this activity was approved on December 30, 2010 and is<br />
still under implementation. The request for PPIAF funding came in light of the impact of the global<br />
financial crisis on the ability of the government of Morocco to finance critical infrastructure investments.<br />
PPIAF support compliments the IFC PPP advisory role to the government and will specifically aim to help<br />
i) design and establish a dedicated PPP unit within the Directorate for State Enterprises and Privatization<br />
and strengthen the Directorate’s PPP expertise via the organization of seminars, and ii) identify pilot<br />