08.10.2018 Views

My Reading on ASQ CQA HB Part I-IA~IE-s

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Part</strong> IB<br />

The Shewhart c<strong>on</strong>trol chart has a baseline and upper and lower limits, shown as dashed lines,<br />

that are symmetric about the baseline. Measurements are plotted <strong>on</strong> the chart versus a time line.<br />

Measurements that are outside the limits are c<strong>on</strong>sidered to be out of c<strong>on</strong>trol.<br />

The baseline for the c<strong>on</strong>trol chart is the<br />

accepted value, an average of the<br />

historical check standard values. A<br />

minimum of 100 check standard values is<br />

required to establish an accepted value.<br />

The upper (UCL) and lower (LCL) c<strong>on</strong>trol<br />

limits are:<br />

UCL = Accepted value + k*process<br />

standard deviati<strong>on</strong><br />

LCL = Accepted value - k*process<br />

standard deviati<strong>on</strong><br />

where the process standard deviati<strong>on</strong> is<br />

the standard deviati<strong>on</strong> computed from the<br />

check standard database.<br />

18 March 1891 – 11March 1967<br />

https://www.itl.nist.gov/div898/handbook/mpc/secti<strong>on</strong>2/mpc221.htm<br />

Charlie Ch<strong>on</strong>g/ Fi<strong>on</strong> Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!