of the Product at the Vessel’s permanent hose connection as set out in the certificates of<br />
quantity and quality so issued.<br />
7.5 Part cargo lots delivered CFR or CIF<br />
Where delivery is made as an unsegregated part cargo lot to the Buyer and a third party,<br />
the quantity determined in accordance with the foregoing shall be adjusted so that,<br />
following completion of discharge of the relevant part cargo lots, the Buyer and such third<br />
party shall each be allocated a percentage of the total loaded quantity equal to that<br />
percentage of the total quantity (determined at each Discharge Port in accordance with<br />
the provisions of Section 7.2.3 above) which was discharged at its Discharge Port. The<br />
costs of such independent inspection shall be shared equally between the parties for their<br />
respective Discharge Ports and the inspector's report shall be made available to all parties.<br />
Section 8 – Risk and property<br />
8.1 CFR and CIF deliveries<br />
8.1.1 Notwithstanding any right of the Seller to retain the documents referred to in<br />
Section 30 until payment, the risk in the Product delivered under the Agreement<br />
shall pass to the Buyer as the Product passes the Vessel's permanent hose<br />
connection at the Loading Terminal and property in the Product shall pass:<br />
8.1.1.1 in the case of delivery as a full cargo lot or, in the case of a part cargo<br />
lot, where the grade and/or quantity is separately ascertainable, as the<br />
Product passes the Vessel's permanent hose connection at the<br />
Loading Terminal; or<br />
8.1.1.2 in the case of delivery as a part cargo lot where the Product<br />
deliverable hereunder is not identifiable and ascertainable on board<br />
the Seller’s Vessel separately from the Product which is destined for<br />
receivers other than the Buyer:<br />
(a) as the Product passes the Vessel's permanent hose connection<br />
at the Discharge Port, if such part cargo is not the last part cargo<br />
to be discharged, or<br />
(b) immediately upon completion of discharge of all other Product at<br />
the previous place(s) of discharge, if such part cargo is the last<br />
cargo to be discharged<br />
as the case may be.<br />
8.1.2 If the Vessel has commenced or completed loading prior to being nominated to<br />
the Buyer pursuant to Section 11, then, subject to the provisions of Section<br />
8.1.1.2, notwithstanding any right of the Seller to retain the documents referred<br />
to in Section 30 until payment, the risk in the Product delivered under the<br />
Agreement shall be deemed to have passed to the Buyer as the Product passed<br />
the Vessel’s permanent hose connection at the Loading Terminal and property in<br />
the Product shall pass immediately upon receipt by the Seller of the Buyer’s<br />
acceptance of such nomination.<br />
8.2 Ex Ship deliveries<br />
The risk and property in the Product delivered under the Agreement shall pass to the<br />
Buyer as the Product passes the Vessel's permanent hose connection at the Discharge<br />
Port.<br />