23.03.2019 Views

BP 2007 Products

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.1.3.1 the date 12 days prior to the first day of the Laydays so notified; or<br />

3.1.3.2 the 20th day of the month preceding the first month in which the<br />

Laydays fall, whichever is the later.<br />

3.2 The Laydays established in accordance with Sections 3.1.2 or 3.1.3 shall, unless<br />

otherwise specifically agreed between the parties, fall entirely within any delivery period<br />

specified in the Special Provisions.<br />

3.3 Where the Laydays are to be established in accordance with Section 3.1.3, the Buyer may<br />

notify the Seller of its preferred Laydays at any time prior to the date of the Seller's notice<br />

given pursuant to such Section. The Seller shall notify its supplier of such preferred<br />

Laydays provided always that the Seller shall not be under any obligation whatsoever to<br />

provide such Laydays.<br />

Section 4 – Nomination of Vessels, etc.<br />

4.1 Full and part cargo lots<br />

Unless otherwise provided in the Special Provisions, delivery hereunder shall be given<br />

and taken in full or part cargo lots at the Buyer's option but subject always to the prior<br />

agreement thereto of the Loading Terminal operator.<br />

4.2 Nomination of Vessel<br />

4.2.1 Each Vessel which is to load the Product hereunder shall be nominated in writing<br />

by the Buyer to the Seller. Such notice (“the nomination”) shall specify:<br />

(a) the name of the Vessel, date built, summer deadweight and cargo tank<br />

capacity excluding slop tanks and flag;<br />

(b) the grade and approximate quantity to be loaded;<br />

(c) the ETA of the Vessel;<br />

(d) the destination(s) of the Vessel;<br />

(e) the length of the Vessel and such other information as may be required by<br />

the Loading Terminal operator from time to time;<br />

(f) full written instructions regarding the particulars and destination of the bills<br />

of lading and such other customary Loading Terminal documentation which<br />

may be required (and, for the avoidance of doubt, (i) the Buyer shall be<br />

liable for all costs resulting from any delays in loading the Product<br />

hereunder due to failure by the Buyer to supply such information in a timely<br />

manner, and (ii) any such delays shall not count as used Laytime or, if the<br />

Vessel is on demurrage, as time on demurrage);<br />

(g) details of any cargo on board or to be laden on board if loading a part cargo;<br />

(h) confirmation that the Vessel complies with the requirements of Schedule F<br />

hereto.<br />

4.2.2 The nomination shall not be effective unless it is received by the Seller not later<br />

than 5 days prior to the first day of the Laydays. Notwithstanding the foregoing,<br />

if the nomination is received by the Seller after such 5th day and is accepted by<br />

the Seller, it shall be effective but, subject to the provisions of Sections 5.2.1 and<br />

6.3, running hours allowed to the Seller for the loading of the Product in<br />

accordance with Section 6.1 shall not commence until such time as the Vessel<br />

has actually commenced loading. In the event that the Agreement is entered<br />

into 5 days or less prior to the first day of the Laydays then the nomination must<br />

be received by the Seller no less than 2 days prior to the first day of the Laydays.<br />

page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!