BP 2007 Products
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Section 11 – Nomination of Vessels, etc.<br />
11.1 Full and part cargo lots<br />
Unless otherwise provided in the Special Provisions, delivery hereunder shall be given<br />
and taken in full or part cargo lots at the Seller's option.<br />
11.2 Nomination of Vessels<br />
The Seller shall give to the Buyer a notice of nomination (“the nomination”) either (1) on<br />
or about the time the Agreement is entered into between the parties, or (2) at least 5 days<br />
prior to the first day of the Loading Terminal Laydays of the Vessel so nominated,<br />
whichever is the later. Such nomination shall specify:<br />
(a) the name of the Vessel, date built, summer deadweight and cargo tank capacity<br />
excluding slop tanks and flag;<br />
(b) the grade and approximate quantity to be loaded (or the bill of lading quantity, if<br />
known);<br />
(c) the Loading Terminal Laydays (or the bill of lading date, if known) and the ETA at the<br />
Discharge Port;<br />
(d) the length of the Vessel and its estimated (or actual, if known) sailing draught on<br />
completion of loading;<br />
(e) the Vessel/charterer's agent at the Discharge Port;<br />
(f) details of any other cargo on board or to be laden on board if delivery is of a part<br />
cargo;<br />
(g) in the case of any sales afloat, Ex Ship or any variation thereof whereby the Product<br />
has been or will be laden onboard (which shall include storage, and any intervening<br />
transhipment as well as by way of carriage) more than one Vessel the Seller shall<br />
provide the name of each such Vessel, date built and flag;<br />
(h) confirmation that the Vessel complies with the requirements of Schedule F hereto.<br />
The Seller undertakes to inform the Buyer of any changes to the ETA advised pursuant to<br />
Section 11.2(c) as soon as practicable after receipt thereof from its supplier or the Vessels’<br />
owner or agent and, where applicable, such information as shall be necessary so as to<br />
establish the time and place of the passing of property pursuant to Section 8.1.<br />
11.3 Buyer’s nomination<br />
The Buyer shall, within one Banking Day or such other period as may be specified in the<br />
Special Provisions after receipt of the Seller's nomination made pursuant to Section 11.2,<br />
notify the Seller of:<br />
11.3.1 the final Discharge Port, if not already specified in the Special Provisions, when<br />
the Seller’s approval thereto shall be required in writing within one Banking Day<br />
thereafter, such approval not to be unreasonably withheld. No change to the final<br />
Discharge Port so nominated or specified shall be made without the Seller's prior<br />
written acceptance which shall not be unreasonably withheld and subject always<br />
to the provisions of Section 11.8; and<br />
11.3.2 if the Special Provisions provide a range within which a Discharge Port or ports<br />
may be nominated, the Seller’s approval to each port shall be required in writing<br />
within one Banking Day after any valid nomination, such approval not to be<br />
unreasonably withheld.<br />
11.3.3 in the case of delivery CFR or CIF, full written instructions regarding the<br />
particulars and destination of the bills of lading and such other customary<br />
Loading Terminal documentation which may be required (and, for the avoidance<br />
page 21