25.04.2022 Views

March/April 2022

The UK's outdoor hospitality business magazine for function venues, glamping, festivals and outdoor events

The UK's outdoor hospitality business magazine for function venues, glamping, festivals and outdoor events

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EVENTS<br />

PRODUCT IN FOCUS<br />

Event Structures<br />

National Strategy<br />

for Economic<br />

Development,<br />

Dundee<br />

Product: Staging, backdrops<br />

and visitor seating<br />

Supplier: QUICKBLOCK, 0141<br />

478 0365, info@quickblock.uk,<br />

www.quickblock.uk<br />

Details: The Scottish<br />

government was launching<br />

its National Strategy for<br />

Economic Development and<br />

QUICKBLOCK was chosen to<br />

provide some of the event<br />

infrastructure.<br />

Businesses are being<br />

challenged to be more<br />

sustainable and are<br />

tasked with looking at the<br />

environmental impact of<br />

events and how to reduce<br />

it. The fact QUICKBLOCK is<br />

made from 100% recycled<br />

plastic, which otherwise would<br />

contribute to landfill or ocean<br />

waste, was a major factor in<br />

the procurement process and<br />

final decision.<br />

The versatility and speed<br />

in which you can assemble,<br />

reconfigure and disassemble<br />

QUICKBLOCK allowed the<br />

contractors to spend more<br />

time on problem areas and<br />

less time on erecting the event<br />

infrastructure as there was no<br />

requirement for special tools<br />

or construction skills.<br />

Due to it’s innovative,<br />

modular design, the solutions<br />

available are endless. For<br />

this event, QUICKBLOCK’s<br />

Main Stage, Visitor Seating<br />

and Location Backdrops were<br />

chosen, all of which were<br />

assembled in less than one<br />

and a half hours.<br />

The 4.8m x 2m stage with<br />

wooden platform was built in<br />

20 minutes. The platform was<br />

then carpeted to provide a<br />

clean, professional finish.<br />

The event required enough<br />

seating for a minimum of 50<br />

visitors. 10 corner sofas and<br />

10 benches, which included<br />

all-weather seat pads, were<br />

assembled in 45 minutes.<br />

Backdrops were used to<br />

create areas for people to<br />

meet, as part of the shell<br />

scheme infrastructure and as<br />

cordons to stop people from<br />

entering restricted areas. Two<br />

contractors erected these<br />

backdrops in 25 minutes<br />

having had no previous<br />

experience using the product.<br />

Customer feedback:<br />

Marketing and<br />

communications director Gill<br />

Simpson said: “We absolutely<br />

love the QUICKBLOCK<br />

product and it reflects our<br />

business values perfectly. Its<br />

flexibility means we can use<br />

it at our varying events, and<br />

it is always a huge talking<br />

point that makes our space<br />

stand out from the crowd.<br />

The QUICKBLOCK team are<br />

the friendliest and most hard<br />

working we have come across,<br />

and whenever we work with<br />

them it simply feels like they<br />

are an extension of our own<br />

team. I couldn’t recommend<br />

QUICKBLOCK more!”<br />

WWW.OPENAIRBUSINESS.COM 59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!