28.09.2023 Views

Catalog_Sprinkler attachment_EN_2023

Sprinkler attachment

Sprinkler attachment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PLUGS<br />

Zykon steel hammerset anchors FZEA<br />

galvanised<br />

Application<br />

• For form-locking anchoring in<br />

undercut of cracked and non-cracked<br />

concrete<br />

• Also applicable in hard natural stone<br />

Your advantages<br />

• European Technical Assessment for<br />

cracked and non-cracked concrete<br />

• Form-locking in the undercut for<br />

additional security<br />

• Only low anchoring depth required<br />

• Almost splay-free function permits<br />

low axial spacing and edge spacing<br />

• Easy visual inspection of correct<br />

anchor set through impact embossing<br />

with the setting tool<br />

• Single-stage drilling procedure with<br />

simultaneous production of the<br />

undercut saves installation time<br />

• Also available in highly corrosion<br />

resistant material HCR (1.4529)<br />

Features<br />

Type<br />

Connecting<br />

thread<br />

Drilling<br />

diameter<br />

[mm]<br />

Anchoring<br />

depth hef<br />

[mm]<br />

Screw-in depth<br />

e<br />

[mm]<br />

fire protection<br />

certified F90<br />

Europäische Technische Bewertung<br />

APPROVED<br />

for M10–M12<br />

FM Permissible load 1) Part no. Sales unit Pack unit<br />

Cracked<br />

concrete<br />

[kN]<br />

Uncracked<br />

concrete<br />

[kN]<br />

10 x 40 M8 M8 10 40 11 - 17 1.6 3.6 107868 1 Pieces<br />

12 x 40 M10 M10 12 13 - 19 x 3 107871<br />

14 x 40 M12 M12 14 15 - 21 x 3.6 107872<br />

1)<br />

The admissible loads apply for single anchors at concrete strength class > C20/25 (B25) for axial tension, without edge<br />

banding, that is without axis and edge distance. The European Technical Assessment requirements must be considered for<br />

dimensioning.<br />

!<br />

These products are manufactured upon request. Delivery time depends on clarification of details and order quantity.<br />

07/<strong>2023</strong><br />

© - progress and quality<br />

5/17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!