28.09.2023 Views

Catalog_Sprinkler attachment_EN_2023

Sprinkler attachment

Sprinkler attachment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TECHNICAL INFORMATION<br />

Plug characteristic values for screws for concrete<br />

Type Multi-Mont i ® MMS for fastenings in concrete, galvanised<br />

Permissible loads of single plugs 1) for the use in concrete for redundant,<br />

non-load-bearing systems in prestressed concrete hollow core slab ceilings,<br />

concrete strength class C30/37 to C50/60 in accordance with Assessment ETA-15/0785<br />

Max. permissible tensile load Nperm or transverse load Vperm of single plugs in a redundant system, without the influence of axial and edge<br />

spacings to component edges as well as steel failure with lever arm<br />

Size [mm] 7.5 10<br />

Material thickness db [mm] 30 40 50 40 50<br />

Concrete compressive strength class ≥ C30/37 2) Nperm [kN] 0.59 2.22 3.95 3.20 5.43<br />

Concrete compressive strength class ≥ C45/55 2) Nperm [kN] 1.97 3.95 3.95 5.67 5.92<br />

Minimum axial spacing smin [mm] 200 200 200 200 200<br />

Minimum edge spacing cmin [mm] 100 120 120 140 140<br />

Installation and plug characteristic values<br />

Size 7.5 10<br />

Material thickness db [mm] 30 40 50 40 50<br />

Nominal drill diameter do [mm] 6 6 6 8 8<br />

Clearance hole in the add-on part df [mm] 9 9 9 12.5 12.5<br />

Static or quasi-static stress<br />

1)<br />

Only for the <strong>attachment</strong> of redundant systems.<br />

2)<br />

According to <strong>EN</strong> 1992-4,7.2.1.3 and 7.2.1.4 and ETA-15/0785 partial safety coefficients on the resistance side of<br />

yM = 1.5 and on the action side of yG = 1.35 were taken into account.<br />

All the specifications in the European Technical Assessment ETA-15/0785 must be taken into account when dimensioning.<br />

Permissible anchor positions<br />

for prestressed concrete hollow core slab ceilings<br />

Min. pitch and edge clearance<br />

for prestressed concrete hollow core slab ceilings<br />

07/<strong>2023</strong><br />

© Müpro - progress and quality<br />

8/35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!