Mounting / <strong>Installation</strong><br />
4.2.1 General <strong>Instruction</strong>s for Connection the Heating Unit<br />
● Before connecting the boiler to the heating system, the heating system<br />
must be rinsed at a minimum of 3 times the flow capacity. The drinking<br />
water pipes must be rinsed at a minimum of 20 times its flow capacity.<br />
● In older systems, a filter must be placed in the heating circuit in the return<br />
supply line before the opening to the boiler.<br />
● Use only untreated tap water to fill <strong>and</strong> refill the heating system.<br />
● The pH value must be between 6 <strong>and</strong> 9.<br />
● Do not add any chemicals to the heating system’s water (e.g. anti-freeze,<br />
water softener, solutions to raise or lower the pH value, chemical<br />
additives <strong>and</strong>/or inhibitors). These can damage the boiler.<br />
● When using plastic pipes (e.g. in floor heaters), the pipes must be air<br />
<strong>and</strong> diffusion tight in accordance with DIN 4726/ 4729.<br />
● If the system’s plastic pipes are not in accordance with the norms, we<br />
recommend separating the boiler circulation system from the heating<br />
system with a (plate) heat exchanger or a filter mounted hydraulically<br />
in front of the boiler connection.<br />
● The temperature of the heating ducts <strong>and</strong> radiators can go up to 95 °C.<br />
4.2.2 Connecting the Heating Unit (Supply <strong>and</strong> Return Lines)<br />
There are flue cut-off devices that must be<br />
mounted directly under the boiler. These<br />
should have the respective diameters of the<br />
connections to which they belong. Permanently<br />
soldered or welded connections are not<br />
allowed.<br />
A separate line for filling <strong>and</strong> draining must be<br />
installed <strong>and</strong> easily accessible. If the line for<br />
filling <strong>and</strong> draining is not at the lowest point of<br />
the unit, an additional device must be installed<br />
so the system can be completely drained.<br />
Older systems <strong>and</strong> floor heating systems require<br />
a filter in the return line directly on the<br />
boiler.<br />
S R A K<br />
V L S V<br />
R L<br />
G<br />
Fig. 13 Connections: BOY III Solo<br />
S R A K<br />
V L W W S V<br />
K W R L<br />
G<br />
Fig. 14 Connections: BOY III Combi<br />
SR Siphon-Cleaning VL Supply WW Warm Water SV Drainage Safety Valve<br />
AK Condensation Drainage RL Return Flow KW Cold Water G Gas Connection<br />
- 15 -<br />
Gebr. Bruns GmbH is not responsible for typographical errors or technical inaccuracies <strong>and</strong> reserves the right to make adjustments.<br />
Gebr. Bruns GmbH • Hauptstraße 200 • 26683 Saterl<strong>and</strong> •Tel.: + 49 (0) 44 92 / 92 46-0 • Fax: + 49 (0) 44 92 / 71 41<br />
www.bruns-heiztechnik.de • info@bruns-heiztechnik.de