30.12.2012 Views

Installation and Operating Instruction

Installation and Operating Instruction

Installation and Operating Instruction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Mounting / <strong>Installation</strong><br />

4.2.1 General <strong>Instruction</strong>s for Connection the Heating Unit<br />

● Before connecting the boiler to the heating system, the heating system<br />

must be rinsed at a minimum of 3 times the flow capacity. The drinking<br />

water pipes must be rinsed at a minimum of 20 times its flow capacity.<br />

● In older systems, a filter must be placed in the heating circuit in the return<br />

supply line before the opening to the boiler.<br />

● Use only untreated tap water to fill <strong>and</strong> refill the heating system.<br />

● The pH value must be between 6 <strong>and</strong> 9.<br />

● Do not add any chemicals to the heating system’s water (e.g. anti-freeze,<br />

water softener, solutions to raise or lower the pH value, chemical<br />

additives <strong>and</strong>/or inhibitors). These can damage the boiler.<br />

● When using plastic pipes (e.g. in floor heaters), the pipes must be air<br />

<strong>and</strong> diffusion tight in accordance with DIN 4726/ 4729.<br />

● If the system’s plastic pipes are not in accordance with the norms, we<br />

recommend separating the boiler circulation system from the heating<br />

system with a (plate) heat exchanger or a filter mounted hydraulically<br />

in front of the boiler connection.<br />

● The temperature of the heating ducts <strong>and</strong> radiators can go up to 95 °C.<br />

4.2.2 Connecting the Heating Unit (Supply <strong>and</strong> Return Lines)<br />

There are flue cut-off devices that must be<br />

mounted directly under the boiler. These<br />

should have the respective diameters of the<br />

connections to which they belong. Permanently<br />

soldered or welded connections are not<br />

allowed.<br />

A separate line for filling <strong>and</strong> draining must be<br />

installed <strong>and</strong> easily accessible. If the line for<br />

filling <strong>and</strong> draining is not at the lowest point of<br />

the unit, an additional device must be installed<br />

so the system can be completely drained.<br />

Older systems <strong>and</strong> floor heating systems require<br />

a filter in the return line directly on the<br />

boiler.<br />

S R A K<br />

V L S V<br />

R L<br />

G<br />

Fig. 13 Connections: BOY III Solo<br />

S R A K<br />

V L W W S V<br />

K W R L<br />

G<br />

Fig. 14 Connections: BOY III Combi<br />

SR Siphon-Cleaning VL Supply WW Warm Water SV Drainage Safety Valve<br />

AK Condensation Drainage RL Return Flow KW Cold Water G Gas Connection<br />

- 15 -<br />

Gebr. Bruns GmbH is not responsible for typographical errors or technical inaccuracies <strong>and</strong> reserves the right to make adjustments.<br />

Gebr. Bruns GmbH • Hauptstraße 200 • 26683 Saterl<strong>and</strong> •Tel.: + 49 (0) 44 92 / 92 46-0 • Fax: + 49 (0) 44 92 / 71 41<br />

www.bruns-heiztechnik.de • info@bruns-heiztechnik.de

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!