Mounting / <strong>Installation</strong><br />

4.2.14 Installing the Emissions Connection to Central Roof Heating<br />

Measure the point where the emission<br />

pipe opening will be based on the position<br />

of the unit. Install the special feed<br />

through socket as appropriate for the<br />

space provided. Lead the emission pipe<br />

through the socket <strong>and</strong> connect it to the<br />

unit. Use the sleeves specially designed<br />

for the opening of the roofing paper in order<br />

to insure it is airtight. The emission<br />

line must be level.<br />

Fig. 22 Emissions Connection to Central<br />

Roof Heating<br />

Follow the installation instructions for the respective emissions system!<br />

4.2.15 Connecting the Condensed Water Drain<br />

Lay plastic piping (min. Ø 32 mm or larger that leads to the drain) app. 2 cm under<br />

the condensed water drain connection. Do not place a permanent connection on the<br />

siphon in the boiler as this hinders maintenance.<br />

4.2.16 Neutralisation<br />

• Fill the boiler siphon to avoid flue gases from escaping into the room.<br />

• The condensed water drain must not be sealed.<br />

• The emission pipe should have a minimum slope of 3 cm per meter<br />

<strong>and</strong> a maximum horizontal length of 5 meters.<br />

• Disposing of condensed water via rain gutters is not permitted.<br />

• Condensed water lines must be installed according to regulation.<br />

ATV Bulletin M 251 regulations <strong>and</strong> state provisions apply! A pH balancing system<br />

can be installed retroactively for the Bruns wall boiler. A neutralization system is required<br />

for boiler capacities exceeding 25 kW. Regional regulations for running condensed<br />

water into the canalisation system are a deciding factor. Neutralisation granulates<br />

must be checked yearly by the operator <strong>and</strong> if necessary, renewed.<br />

- 21 -<br />

Gebr. Bruns GmbH is not responsible for typographical errors or technical inaccuracies <strong>and</strong> reserves the right to make adjustments.<br />

Gebr. Bruns GmbH • Hauptstraße 200 • 26683 Saterl<strong>and</strong> •Tel.: + 49 (0) 44 92 / 92 46-0 • Fax: + 49 (0) 44 92 / 71 41<br />

www.bruns-heiztechnik.de • info@bruns-heiztechnik.de

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!