30.12.2012 Views

Installation and Operating Instruction

Installation and Operating Instruction

Installation and Operating Instruction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Mounting / <strong>Installation</strong><br />

4.2.13 Connecting the Unit to the Chimney<br />

Calculate the height of the opening for<br />

the emission pipe. Make sure to take<br />

headroom for the test connection <strong>and</strong> the<br />

revision T-piece (T-fitting) into account.<br />

m a x . 1 6 0 m m<br />

Ø 1 0 m m<br />

Fig. 18 Cross Section of the Duct<br />

Position the support bar according to the<br />

diagram to the right. The support bar<br />

must be level.<br />

- 19 -<br />

2 1 0 m m<br />

Fig. 17 BOY III with Emission Connection<br />

The opening for mounting the support bar<br />

should be made according to the diagram.<br />

Make sure the opening is no larger<br />

than160 mm x 160 mm; otherwise<br />

the cover will not be large enough.<br />

Drill the hole for the support bar with a 10<br />

mm bit. The support bar must be level.<br />

Fig. 19 Installing the Support Bar<br />

Gebr. Bruns GmbH is not responsible for typographical errors or technical inaccuracies <strong>and</strong> reserves the right to make adjustments.<br />

Gebr. Bruns GmbH • Hauptstraße 200 • 26683 Saterl<strong>and</strong> •Tel.: + 49 (0) 44 92 / 92 46-0 • Fax: + 49 (0) 44 92 / 71 41<br />

www.bruns-heiztechnik.de • info@bruns-heiztechnik.de

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!