Installation and Operating Instruction
Installation and Operating Instruction
Installation and Operating Instruction
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Mounting / <strong>Installation</strong><br />
4.2.13 Connecting the Unit to the Chimney<br />
Calculate the height of the opening for<br />
the emission pipe. Make sure to take<br />
headroom for the test connection <strong>and</strong> the<br />
revision T-piece (T-fitting) into account.<br />
m a x . 1 6 0 m m<br />
Ø 1 0 m m<br />
Fig. 18 Cross Section of the Duct<br />
Position the support bar according to the<br />
diagram to the right. The support bar<br />
must be level.<br />
- 19 -<br />
2 1 0 m m<br />
Fig. 17 BOY III with Emission Connection<br />
The opening for mounting the support bar<br />
should be made according to the diagram.<br />
Make sure the opening is no larger<br />
than160 mm x 160 mm; otherwise<br />
the cover will not be large enough.<br />
Drill the hole for the support bar with a 10<br />
mm bit. The support bar must be level.<br />
Fig. 19 Installing the Support Bar<br />
Gebr. Bruns GmbH is not responsible for typographical errors or technical inaccuracies <strong>and</strong> reserves the right to make adjustments.<br />
Gebr. Bruns GmbH • Hauptstraße 200 • 26683 Saterl<strong>and</strong> •Tel.: + 49 (0) 44 92 / 92 46-0 • Fax: + 49 (0) 44 92 / 71 41<br />
www.bruns-heiztechnik.de • info@bruns-heiztechnik.de