<strong>Public</strong> <strong>Information</strong> <strong>Booklet</strong><br />
The thickness <strong>of</strong> pindan on the southern site is expected to be less than the north.<br />
Although there will be similar difficulties with foundations, the thinner layer should make it<br />
easier and require less land for managing and processing the pindan sand.<br />
Figure 18: Potential area requiring shore protection if a northern option is selected<br />
Dredging and Blasting Requirements<br />
Questions:<br />
� What is the relative duration <strong>of</strong> dredging for the 2 options (north and south)<br />
and what are the disposal site options?<br />
� What are the estimated blasting and dredging requirements?<br />
� What is the difference in the volume and duration <strong>of</strong> dredging in respect <strong>of</strong> the<br />
different location options?<br />
General<br />
It will be necessary to establish access for shipping to both the export jetties and the<br />
material <strong>of</strong>floading facility. This will require the dredging <strong>of</strong> a channel/ship turning basin<br />
and berth pocket at both the export jetty and material <strong>of</strong>floading facility.<br />
5279225 34