<strong>Public</strong> <strong>Information</strong> <strong>Booklet</strong><br />
WA-31-R; WA-32-R). BHP Billiton, BP, Chevron and Shell are the joint venture<br />
participants.<br />
Personnel and Management<br />
Question ñ What kinds <strong>of</strong> staff will the company employ?<br />
The peak construction workforce for the foundation proponentís initial development (i.e.<br />
up to 3 trains) at the <strong>Precinct</strong> could be expected to be between approximately 2,500-<br />
3,500 people. Final numbers will be dependent on facility size, phasing <strong>of</strong> facilities (e.g.<br />
one <strong>LNG</strong> train at a time or multiple at once), degree <strong>of</strong> concurrent construction and if<br />
other proponents are building facilities simultaneously.<br />
The size <strong>of</strong> operational workforce will in part depend on how many proponents end up<br />
operating within the <strong>Precinct</strong>. However, the core operations workforce required for dayto-day<br />
operation <strong>of</strong> the initial development (i.e. up to three trains) within the <strong>Precinct</strong><br />
could be expected to be between 300 and 500 people. During the operational life <strong>of</strong> the<br />
project the facility will be operated on a 24 hour a day, seven days a week basis<br />
excluding planned shutdown periods. During planned major maintenance and<br />
turnarounds and influx <strong>of</strong> shutdown personnel will occur with an estimated total workforce<br />
<strong>of</strong> up to 900 people for up to 1 month duration.<br />
Typical employment opportunities during the construction phase <strong>of</strong> an <strong>LNG</strong> facility with<br />
the proponentís contractors would include:<br />
� Tradesperson roles ñ labourers, steel fixers, electricians, carpenters, riggers,<br />
mechanical fitters, welders;<br />
� Pr<strong>of</strong>essional ñ Accountants, human resource managers and assistants, community<br />
relations advisers, engineers, safety advisors, geologists, maintenance technicians;<br />
� Site preparation/temporary facilities ñ operators/Labourers, grano workers/concrete<br />
finishers, steel fixers, carpenters, electricians;<br />
� Civils - operators/labourers, grano workers, steel fixers, carpenters, electricians and<br />
support trades;<br />
� <strong>LNG</strong>/condensate tanks ñ operators/labourers, grano workers/concrete finishers, steel<br />
fixers, carpenters, electricians, welders, riggers, pipe fitters, plasterers/boilermakers,<br />
support trades;<br />
� Jetty ñ operators/labourers, grano workers/concrete finishers, steel fixers, carpenters,<br />
electricians, welders, riggers, pipe fitters, plasterers/boilermakers, support trades;<br />
� Mechanical ñ mechanical fitters, welders, riggers, pipe fitters, platers/boilermakers,<br />
support trades;<br />
� Electrical & instrumental ñ electricians, installation technicians, installation pipe<br />
fitters, support trades;<br />
� Insulation & painting ñ welders, riggers, pipe fitters, plasterers/boilermakers,<br />
mechanical fitters, support trades;<br />
5279225 87