<strong>Public</strong> <strong>Information</strong> <strong>Booklet</strong><br />

WA-31-R; WA-32-R). BHP Billiton, BP, Chevron and Shell are the joint venture<br />

participants.<br />

Personnel and Management<br />

Question ñ What kinds <strong>of</strong> staff will the company employ?<br />

The peak construction workforce for the foundation proponentís initial development (i.e.<br />

up to 3 trains) at the <strong>Precinct</strong> could be expected to be between approximately 2,500-<br />

3,500 people. Final numbers will be dependent on facility size, phasing <strong>of</strong> facilities (e.g.<br />

one <strong>LNG</strong> train at a time or multiple at once), degree <strong>of</strong> concurrent construction and if<br />

other proponents are building facilities simultaneously.<br />

The size <strong>of</strong> operational workforce will in part depend on how many proponents end up<br />

operating within the <strong>Precinct</strong>. However, the core operations workforce required for dayto-day<br />

operation <strong>of</strong> the initial development (i.e. up to three trains) within the <strong>Precinct</strong><br />

could be expected to be between 300 and 500 people. During the operational life <strong>of</strong> the<br />

project the facility will be operated on a 24 hour a day, seven days a week basis<br />

excluding planned shutdown periods. During planned major maintenance and<br />

turnarounds and influx <strong>of</strong> shutdown personnel will occur with an estimated total workforce<br />

<strong>of</strong> up to 900 people for up to 1 month duration.<br />

Typical employment opportunities during the construction phase <strong>of</strong> an <strong>LNG</strong> facility with<br />

the proponentís contractors would include:<br />

� Tradesperson roles ñ labourers, steel fixers, electricians, carpenters, riggers,<br />

mechanical fitters, welders;<br />

� Pr<strong>of</strong>essional ñ Accountants, human resource managers and assistants, community<br />

relations advisers, engineers, safety advisors, geologists, maintenance technicians;<br />

� Site preparation/temporary facilities ñ operators/Labourers, grano workers/concrete<br />

finishers, steel fixers, carpenters, electricians;<br />

� Civils - operators/labourers, grano workers, steel fixers, carpenters, electricians and<br />

support trades;<br />

� <strong>LNG</strong>/condensate tanks ñ operators/labourers, grano workers/concrete finishers, steel<br />

fixers, carpenters, electricians, welders, riggers, pipe fitters, plasterers/boilermakers,<br />

support trades;<br />

� Jetty ñ operators/labourers, grano workers/concrete finishers, steel fixers, carpenters,<br />

electricians, welders, riggers, pipe fitters, plasterers/boilermakers, support trades;<br />

� Mechanical ñ mechanical fitters, welders, riggers, pipe fitters, platers/boilermakers,<br />

support trades;<br />

� Electrical & instrumental ñ electricians, installation technicians, installation pipe<br />

fitters, support trades;<br />

� Insulation & painting ñ welders, riggers, pipe fitters, plasterers/boilermakers,<br />

mechanical fitters, support trades;<br />