� People ñ capability in terms <strong>of</strong> leadership skills, relevant knowledge and experience,<br />
and the organisational culture they create<br />
Woodside believe that injuries and incidents are unacceptable and are striving to improve<br />
performance by focusing on delivering six health and safety imperatives:<br />
� Select and manage principal contractors in line with Woodside values and<br />
commitment to deliver outstanding Health and Safety performance<br />
� Embed deeply ëOur Safety Cultureí<br />
� Understand and control major accident events and major health hazards through the<br />
asset life cycle<br />
� Understand and control occupational health risks<br />
� Health and Safety and integrity processes, standards, procedures and rules are<br />
understood and applied as intended<br />
� Improve learning and communicating lessons from incidents and warning signs to<br />
avoid repeat incidents<br />
In the event <strong>of</strong> an incident occurring, Woodside responds by immediately taking action to<br />
prevent escalation and make the site safe. Incidents are reported in a timely manner,<br />
classified according to a Woodside matrix and then investigated to identify root causes.<br />
Corrective actions are determined and then implemented to prevent recurrence.<br />
Incidents and their learningísí are communicated to the workforce and major<br />
investigations are reviewed by senior management.<br />
Question:<br />
If there was a tsunami or earthquake, what would the consequences <strong>of</strong> that be?<br />
Earthquake and tsunami impact are design cases for the <strong>LNG</strong> plant. Once a site is<br />
selected a seismic (and tsunami) assessment will be carried out to determine the<br />
likelihood and consequences <strong>of</strong> these natural events and a design case will be selected<br />
to appropriately manage the risk.<br />
The land elevation at James Price Point is some 15 metres above sea level, which is the<br />
recommended height to protect the facility against possible tsunami events.<br />
Consequently a tsunami is unlikely to have a significant effect.<br />
Question:<br />
If the plant it built incorrectly, how quickly can the mistake be corrected?<br />
The foundation proponent, Woodside, is an experienced operator <strong>of</strong> <strong>LNG</strong> facilities which<br />
includes five operating trains in Karratha as well as a train under construction for the<br />
Pluto project. In addition Woodside is actively planning and designing new <strong>LNG</strong> trains for<br />
the Pluto, <strong>Browse</strong> and Sunrise projects. This experience combined with the<br />
internationally recognised joint venturers and contractors involved should minimise any<br />
impact. However there are <strong>LNG</strong> developments that have had delays due to technical<br />
problems. These problems are typically resolved in under a year and rarely do they take<br />
longer than two years to resolve.<br />