15.01.2013 Views

Browse LNG Precinct - Public Information Booklet - Department of ...

Browse LNG Precinct - Public Information Booklet - Department of ...

Browse LNG Precinct - Public Information Booklet - Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Public</strong> <strong>Information</strong> <strong>Booklet</strong><br />

Questions:<br />

� What/where is the proposed access road to the <strong>Precinct</strong>. Will there be a<br />

bypass road round the <strong>Precinct</strong> for the TOs to go further north?<br />

� If the southern site is chosen ñ will a bypass road be built?<br />

A highway standard public road will be required to link the <strong>Precinct</strong> to the Broome<br />

Road/Highway. This could be achieved by either upgrading Manari Road or via a new<br />

connection to the Broome to Cape Leveque Road.<br />

Whether the <strong>Precinct</strong> is just to the north or south <strong>of</strong> James Price Point, access to James<br />

Price Point via Manari Road will be maintained. Should the southern option be chosen<br />

then construction <strong>of</strong> a bypass track around the <strong>Precinct</strong> will be provided.<br />

Land Area<br />

Questions:<br />

� A few months ago you were looking at 1,000 hectares ñ does the area now<br />

take into account land and sea requirements?<br />

� How much land is needed for a gas plant?<br />

When the Northern Development Taskforce originally spoke <strong>of</strong> 1,000 hectares, this was<br />

for <strong>LNG</strong> processing alone on land. In order to accommodate other facilities associated<br />

with the <strong>LNG</strong> <strong>Precinct</strong> such as: laydown and common user areas; internal<br />

exclusion/safety zones; statutory buffer zones outside <strong>of</strong> the fence; and an allowance for<br />

potential cultural heritage protection requirements. The land area was described in more<br />

detail during the Heads <strong>of</strong> Agreement negotiations. However, it was also agreed under<br />

the Heads <strong>of</strong> Agreement that the parties would work together to minimise the total area<br />

required to establish the <strong>LNG</strong> <strong>Precinct</strong>.<br />

As stated in the Heads <strong>of</strong> Agreement between the State, Woodside and the KLC,<br />

authorised by the Goolarabooloo Jabirr Jabirr native title claimants, the total area <strong>of</strong> land<br />

and water for the <strong>LNG</strong> <strong>Precinct</strong> will be, subject to heritage protection considerations,<br />

approximately 3,500 hectares (approximately 2,500 hectares <strong>of</strong> land and 1,000 hectares<br />

<strong>of</strong> waters) excluding the statutory buffer zone.<br />

The total land area inside the fence is divided up in the following way:<br />

� 2 industrial blocks for proponents (total <strong>of</strong> approximately 1,000 hectares)<br />

� Common user area (service corridor, lay down areas and internal buffer areas being<br />

a total <strong>of</strong> approximately 500-1,000 hectares)<br />

� Approximately 1,000 hectares <strong>of</strong> land and waters for the port<br />

Outside <strong>of</strong> the fenced area will be the following:<br />

� Workers accommodation (up to 200 hectares)<br />

5279225 46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!