<strong>Public</strong> <strong>Information</strong> <strong>Booklet</strong><br />
Questions:<br />
� What/where is the proposed access road to the <strong>Precinct</strong>. Will there be a<br />
bypass road round the <strong>Precinct</strong> for the TOs to go further north?<br />
� If the southern site is chosen ñ will a bypass road be built?<br />
A highway standard public road will be required to link the <strong>Precinct</strong> to the Broome<br />
Road/Highway. This could be achieved by either upgrading Manari Road or via a new<br />
connection to the Broome to Cape Leveque Road.<br />
Whether the <strong>Precinct</strong> is just to the north or south <strong>of</strong> James Price Point, access to James<br />
Price Point via Manari Road will be maintained. Should the southern option be chosen<br />
then construction <strong>of</strong> a bypass track around the <strong>Precinct</strong> will be provided.<br />
Land Area<br />
Questions:<br />
� A few months ago you were looking at 1,000 hectares ñ does the area now<br />
take into account land and sea requirements?<br />
� How much land is needed for a gas plant?<br />
When the Northern Development Taskforce originally spoke <strong>of</strong> 1,000 hectares, this was<br />
for <strong>LNG</strong> processing alone on land. In order to accommodate other facilities associated<br />
with the <strong>LNG</strong> <strong>Precinct</strong> such as: laydown and common user areas; internal<br />
exclusion/safety zones; statutory buffer zones outside <strong>of</strong> the fence; and an allowance for<br />
potential cultural heritage protection requirements. The land area was described in more<br />
detail during the Heads <strong>of</strong> Agreement negotiations. However, it was also agreed under<br />
the Heads <strong>of</strong> Agreement that the parties would work together to minimise the total area<br />
required to establish the <strong>LNG</strong> <strong>Precinct</strong>.<br />
As stated in the Heads <strong>of</strong> Agreement between the State, Woodside and the KLC,<br />
authorised by the Goolarabooloo Jabirr Jabirr native title claimants, the total area <strong>of</strong> land<br />
and water for the <strong>LNG</strong> <strong>Precinct</strong> will be, subject to heritage protection considerations,<br />
approximately 3,500 hectares (approximately 2,500 hectares <strong>of</strong> land and 1,000 hectares<br />
<strong>of</strong> waters) excluding the statutory buffer zone.<br />
The total land area inside the fence is divided up in the following way:<br />
� 2 industrial blocks for proponents (total <strong>of</strong> approximately 1,000 hectares)<br />
� Common user area (service corridor, lay down areas and internal buffer areas being<br />
a total <strong>of</strong> approximately 500-1,000 hectares)<br />
� Approximately 1,000 hectares <strong>of</strong> land and waters for the port<br />
Outside <strong>of</strong> the fenced area will be the following:<br />
� Workers accommodation (up to 200 hectares)<br />