17.01.2013 Views

Installer manual - nibe.com

Installer manual - nibe.com

Installer manual - nibe.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

14<br />

Cold and hot water<br />

Connecting cold and hot water<br />

The mixing valve must be installed if the factory setting<br />

is changed so that the temperature can exceed 60 °C. If<br />

the factory setting is changed, national regulations must<br />

be observed. The setting is made in menu 5.1.1 (page<br />

43).<br />

-EB15<br />

-FL2<br />

-CM1<br />

XL4<br />

XL3<br />

Heating medium side<br />

Connecting the climate system<br />

When connecting to a system with thermostats on all<br />

radiators/under�oor heating coils, a relief valve must be<br />

�tted, or athermostat must be removed to ensure su�cient<br />

�ow.<br />

-EB15<br />

-FL2<br />

-CM1<br />

Chapter 4 | Pipe connections<br />

XL1<br />

XL2<br />

Pool<br />

Connecting pool<br />

Charging of the pool is controlled by the pool sensor. In<br />

the case o� ow pool temperatures, the shuttle valve reverses<br />

direction and opens towards the pool exchanger.<br />

The POOL 500 accessory is required for this connection.<br />

-EB101<br />

-CL11-QN19<br />

-EB15<br />

-CL11<br />

-FL2<br />

-CM1<br />

XL39<br />

-AA5<br />

-EP5<br />

-GP9 -BT51 -HQ4<br />

Two or more climate systems<br />

When more than one climate system is to be heated, the<br />

following connection can be used.<br />

The ECS 40/ECS 41. accessory is required for this connection.<br />

-EB15<br />

-FL2<br />

-CM1<br />

-EP21<br />

-AA5<br />

XL1<br />

XL2<br />

-BT2 -GP20<br />

-QN11 -BT3<br />

NIBE VVM 500<br />

POOL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!