17.01.2013 Views

Installer manual - nibe.com

Installer manual - nibe.com

Installer manual - nibe.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

24<br />

6 Commissioning and adjusting<br />

Preparations<br />

1. Check that the switch (SF1) is in position " ".<br />

2. Check that the drain valve is fully closed and that the<br />

temperature limiter (FD1) has not deployed.<br />

Caution<br />

Check the temperature limiter (FD1) and miniature<br />

circuit-breaker (FA1) in VVM 500. They<br />

may have tripped during transportation.<br />

Filling and venting<br />

Filling the hot water coil<br />

1. Open a hot water tap in the house.<br />

2. Open the externally mounted shut-off valve. This<br />

valve should then be fully open during operations.<br />

3. When water <strong>com</strong>es out of the hot water tap, the hot<br />

water coil is full and the tap can be closed.<br />

Filling the climate system<br />

1. Open the vent valves (QM20).<br />

2. Open the externally mounted filler valve. The boiler<br />

section and the rest of the climate system are filled<br />

with water.<br />

3. When the water that exits the vent valves (QM20)<br />

is not mixed with air, close the vent valves. After a<br />

while the pressure rises on the externally mounted<br />

pressure gauge. When the pressure for the externally<br />

mounted safety valve has been reached, it starts to<br />

release water. Close the filler valve.<br />

4. Open the externally mounted safety valve until the<br />

boiler pressure falls to the normal working range<br />

(approx. 1 bar) and check that there is not air in the<br />

system by turning the vent valves (QM20).<br />

Venting the climate system<br />

1. Turn off the power supply to the indoor module.<br />

2. Vent the indoor module via the vent valves (QM20)<br />

and the rest of the climate system via the relevant<br />

vent valves.<br />

3. Keep topping up and venting until all air has been<br />

removed and the pressure is correct.<br />

Chapter 6 | Commissioning and adjusting<br />

����� ������<br />

VVM 500<br />

������� �����<br />

APH<br />

NIBE VVM 500

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!