24<br />
6 Commissioning and adjusting<br />
Preparations<br />
1. Check that the switch (SF1) is in position " ".<br />
2. Check that the drain valve is fully closed and that the<br />
temperature limiter (FD1) has not deployed.<br />
Caution<br />
Check the temperature limiter (FD1) and miniature<br />
circuit-breaker (FA1) in VVM 500. They<br />
may have tripped during transportation.<br />
Filling and venting<br />
Filling the hot water coil<br />
1. Open a hot water tap in the house.<br />
2. Open the externally mounted shut-off valve. This<br />
valve should then be fully open during operations.<br />
3. When water <strong>com</strong>es out of the hot water tap, the hot<br />
water coil is full and the tap can be closed.<br />
Filling the climate system<br />
1. Open the vent valves (QM20).<br />
2. Open the externally mounted filler valve. The boiler<br />
section and the rest of the climate system are filled<br />
with water.<br />
3. When the water that exits the vent valves (QM20)<br />
is not mixed with air, close the vent valves. After a<br />
while the pressure rises on the externally mounted<br />
pressure gauge. When the pressure for the externally<br />
mounted safety valve has been reached, it starts to<br />
release water. Close the filler valve.<br />
4. Open the externally mounted safety valve until the<br />
boiler pressure falls to the normal working range<br />
(approx. 1 bar) and check that there is not air in the<br />
system by turning the vent valves (QM20).<br />
Venting the climate system<br />
1. Turn off the power supply to the indoor module.<br />
2. Vent the indoor module via the vent valves (QM20)<br />
and the rest of the climate system via the relevant<br />
vent valves.<br />
3. Keep topping up and venting until all air has been<br />
removed and the pressure is correct.<br />
Chapter 6 | Commissioning and adjusting<br />