40 Installation Qualification (IQ)<br />

Installation Qualification (IQ)<br />

Installation report Certification on the functionality of the device. During installation<br />

of the device, an installation report (IQ document) is created<br />

upon request in coordination with the technical support of<br />

the manufacturer.<br />

This installation report needs to be completed in full and signed<br />

by both parties. It serves as proof of the properly executed<br />

installation and the functionality of the device.<br />

Operation Qualification (OQ)<br />

Extensive<br />

functionality test<br />

Extensive test of the detector's functionality. A successfully executed<br />

OQ ensures that the detector functions properly.<br />

Test Intervals<br />

Run the device test at the following time intervals:<br />

Average useful life Device test<br />

1 to 5 days/week: Every 6<br />

months<br />

More than 5 days/week or 24 hours/day: Every 3<br />

months<br />

Operation with buffer solutions or other salt<br />

solutions:<br />

Execution<br />

Every 3<br />

months<br />

The execution is done either by the manufacturer's technical service<br />

or by a technical service authorized by the manufacturer.<br />

Note The OQ documentation required for executing the OQ is with<br />

costs (once) and can be ordered separately from the manufacturer.