12.07.2015 Views

notice de matage sparcraft

notice de matage sparcraft

notice de matage sparcraft

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6PRECAUTIONS BEFORE STEPPING THE MAST)Masthead equipment- Fitting of equipment (navigation lights,...) on land:complete this installation at the end. Cut down theamount of times you have to climb the mast and makesure they fit before stepping;- Fitting from the top: prepare the fragile elements (aerials and/or windindicators), but do not fix them until the mast is stepped and checked(temporary fitting of aerial upsi<strong>de</strong> down before lifting). Please consult theinstructions from the manufacturers of such equipment and the recommendationsfrom the crane-driver during the lifting process.Checking the cables and connections- any electric shock can cause corrosion.Please check the condition of the cables andthe bulbs in the navigation lights. Have them tested ifnecessary;- Check the electrical connections and protect them withan appropriate product.Final visual checkPlanted mast should read keel stepped mast : check the positionof the watertight system insi<strong>de</strong> the mast (generally foundat the lowest halyard exit). You should only see daylightthrough the central tube for the electric cables. No light shouldpass through the main section10 /www.<strong>sparcraft</strong>.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!