12.07.2015 Views

notice de matage sparcraft

notice de matage sparcraft

notice de matage sparcraft

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNPACKING AND CHECKING P2 to 31234 Inventory / Remin<strong>de</strong>r Note down the serial numbers- Mast N° _ _ _ _ _ _ _ _ _ _ _ _- Boom N° _ _ _ _ _ _ _ _ _ _ _ _- Sprea<strong>de</strong>rs N° _ _ _ _ _ _ _ _ _ _ _ _- Standing rigging N° _ _ _ _ _ _ _ _ _ _ _ _PREPARATION mast and equipment Preparation of the tools required Installation of the mast and centre of gravityPRE-ASSEMBLY CONNECTIONS Drilling and pre-assemblyRUNNING RIGGING Passing the halyards through and checksP3P4P4FITTING THE STANDING RIGGING P5 to 8567 Insertion of shells / types of masthead gear (5.1) Installation of sprea<strong>de</strong>rs and tip fittings (5.2) Precautions with discontinuous rigging (5.3) Precautions with continuous rigging (5.4) Line up all the si<strong>de</strong> rigging against the mast (5.5) Fit the runner and backstays (5.6) Fit the forestay (5.7)PRECAUTIONS BEFORE STEPPING THE MAST P9 to 10 Checking and preparing the turnbuckles Protection Electrical equipment Visual checkHOISTING Precautions when hoisting The sling Safety during the manoeuvreP1124 /www.<strong>sparcraft</strong>.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!