12.07.2015 Views

March 2009 - Indocement Tunggal Prakarsa, PT.

March 2009 - Indocement Tunggal Prakarsa, PT.

March 2009 - Indocement Tunggal Prakarsa, PT.

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The original consolidated financial statements included herein are inIndonesian language.<strong>PT</strong> INDOCEMENT TUNGGAL PRAKARSA Tbk.DAN ANAK PERUSAHAANCATATAN ATAS LAPORAN KEUANGANKONSOLIDASITiga Bulan yang Berakhir pada Tanggal-tanggal31 Maret <strong>2009</strong> dan 2008(Disajikan dalam rupiah, kecuali dinyatakan lain)<strong>PT</strong> INDOCEMENT TUNGGAL PRAKARSA Tbk.AND SUBSIDIARIESNOTES TO THE CONSOLIDATED FINANCIALSTATEMENTSThree Months Ended <strong>March</strong> 31, <strong>2009</strong> and 2008(Expressed in rupiah, unless otherwise stated)24. PERJANJIAN-PERJANJIAN DAN KOMITMENYANG SIGNIFIKANa. Perusahaan dan Pertamina menandatanganiperjanjian jual dan beli bahan bakar minyakyang terdiri dari premium, minyak solar,minyak diesel industri dan minyak bakar danberlaku efektif pada tanggal 1 September2008. Perjanjian tersebut mencakup, antaralain, harga dasar bahan bakar minyak,rencana jumlah bahan bakar minyak yangdibutuhkan, spesifikasi bahan bakar minyakdan persyaratan pembayaran. Perjanjian iniakan berlaku sampai dengan 31 Desember<strong>2009</strong>.Untuk tiga bulan yang berakhir pada tanggal31 Maret <strong>2009</strong>, jumlah pembelian bahan bakarminyak dari Pertamina adalah sebesarRp57.407.857.153.b. Sehubungan dengan “shredding plant project”di pabrik Citeureup, pada tanggal 30 Juni2008, Perusahaan dan Societe Industrielle DeLa Doux - Sa, Swiss menandatangani kontrakuntuk penyediaan peralatan dan jasapelaksanaan dengan keseluruhan nilai kontraksebesar EUR1.390.000. Pada tanggal 31Maret <strong>2009</strong>, “shredding plant project” masihdalam tahap pengerjaan awal.c. Sehubungan dengan “coal grinding project”Perusahaan di pabrik Citeureup, pada tanggal14 Maret 2008, Perusahaan dan Polysius AG,Jerman, menandatangani kontrak untukpenyediaan peralatan dan jasa pelaksanaandengan keseluruhan nilai kontrak sebesarEUR2.765.000 dan jasa pengawasan dalampembangunan, instalasi, pengerjaan danpengujian peralatan tersebut dengan nilaikontrak sejumlah EUR282.000.Selain itu, Perusahaan juga menandatanganikontrak dengan FLSmidth A/S, Denmark padatanggal 28 Juli 2008 untuk penyediaanperalatan coal grinding plant dan jasapelaksanaan dengan keseluruhan nilai kontraksebesar EUR7.105.000 dan jasa pengawasandalam pembangunan, instalasi, pengerjaandan pengujian peralatan tersebut dengan nilaikontrak sejumlah EUR381.100. Tanggal efektifdari kontrak penyediaan peralatan tersebutadalah tanggal 24 September 2008. Padatanggal 31 Maret <strong>2009</strong>, “coal grinding project”masih dalam tahap pengerjaan awal.24. SIGNIFICANT AGREEMENTS ANDCOMMITMENTSa. The Company and Pertamina have signed acontract for the sale and purchase of fuel oilconsisting of gasoline, diesel oil, industrialdiesel oil and marine fuel with the effectivedate as of September 1, 2008. The agreementstipulates, among others, the base price of fueloil, volume plan of fuel oil, specifications of fueloil and terms of payment. This agreement willexpire on December 31, <strong>2009</strong>.For the three months ended <strong>March</strong> 31, <strong>2009</strong>,total fuel oil purchased from Pertaminaamounted to Rp57,407,857,153.b. In relation to the Company’s shredding plantproject in Citeureup Plantsite, on June 30,2008, the Company and Societe IndustrielleDe La Doux - Sa, Switzerland, signed acontract for the supply of equipment andengineering services for a total contractamount of EUR1,390,000. As of <strong>March</strong> 31,<strong>2009</strong>, the shredding plant project is in theinitial construction stage.c. In relation to the Company’s coal grindingproject in Citeureup Plantsite, on <strong>March</strong> 14,2008, the Company and Polysius AG,Germany, signed a contract for the supply ofequipment and engineering services for a totalcontract amount of EUR2,765,000, andsupervisory services in the erection,installation, commissioning and testing of theequipment supplied for a total contract amountof approximately EUR282,000.In connection with the same project, theCompany also signed a contract withFLSmidth A/S, Denmark, on July 28, 2008 forthe supply of equipment and engineeringservices for a total contract amount ofEUR7,105,000 and supervisory services in theerection, installation, commissioning andtesting of the equipment supplied for a totalcontract amount of approximatelyEUR381,100. The effective date of thisequipment supply contract is September 24,2008. As of <strong>March</strong> 31, <strong>2009</strong>, the coal grindingproject is in the initial construction stage.69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!