MOD. 2HYD<br />
GUIDELINES FOR THE INSTALLATION ENGINEER<br />
CONTROLS TO BE CARRIED OUT AFTER INSTALLATION<br />
LIFT Type................................................................................... Serial number.......................................................<br />
YES NO NOTE:<br />
1. CHECK THAT INSTALLATION AND TIGHTNESS OF FLOOR ANCHORS ARE CORRECT<br />
2. CHECK THAT ELECTRICAL CONNECTION IS IN COMPLIANCE TO THE NORMS<br />
3. CHECK THAT THE PNEUMATIC SUPPLY IS CORRECT (IF INSTALLED)<br />
4. CHECK THAT THE LIFT OPERATION IS CORRECT ACCORDING TO USER MANUAL<br />
5. CHECK THE CORRECT FUNCTION OF THE ELECTRICAL SAFETY DEVICES<br />
6. CHECK THE EMERGENCY BUTTON OPERATION<br />
7. CHECK THE CORRECT INSERTING OF THE MECHANICAL SAFETY DEVICES<br />
8. CHECK THE CORRECT INSERTING OF THE ARMS LOCKING DEVICES<br />
9. CHECK THE CORRECT ASSEMBLING OF THE ANTI-TOE TRAPPING DEVICES<br />
10. CHECK THE PERFECT SEALING OF THE HYDRAULIC SYSTEM<br />
11. CHECK THE OIL LEVEL<br />
12. CHECK THE EMERGENCY LOWERING OPERATION<br />
13. CHECK THE APPLICATION OF THE WARNING LABELS, AS PER LAYOUT<br />
14. CHECK THE CORRECT LUBRICATION OF GUIDES<br />
15. LIFT TESTING WITH MAXIMUM LOAD<br />
16. CHECK DOCUMENTATION (user manual & declaration of conformity)<br />
17. TRAINING OF PERSONNEL QUALIFIED TO USE THE LIFT<br />
NOTE:<br />
Date: User: Installation engineer:<br />
_____/______/_____ Stamp and Signature Stamp and Signature<br />