13.05.2013 Views

Eliane Aparecida Justino - Universidade Federal de Uberlândia

Eliane Aparecida Justino - Universidade Federal de Uberlândia

Eliane Aparecida Justino - Universidade Federal de Uberlândia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Justino</strong>, E.A. Study of runoff control with the use of retetion reservoir in the Córrego<br />

Lagoinha watershed, <strong>Uberlândia</strong>-MG city. Msc Dissertation, College of Civil<br />

Engineering, <strong>Fe<strong>de</strong>ral</strong> University of <strong>Uberlândia</strong>, 2004. 183p.<br />

ABSTRACT<br />

The increase of the frequency of inundations occurrence in the brazilian cities in the last<br />

years motivated the <strong>de</strong>velopment of this work, in which the efficiency of a retention<br />

reservoir is evaluated, to control the runoff increase, direct effect of the uncontrolled<br />

growth of the urban mesh. To simulate urbanization a watershed was chosen in <strong>Uberlândia</strong><br />

city, then four different occupation sceneries were analyzed: pre-urbanization, current,<br />

future I and future II. The retention reservoir adopted is of the centralized type and it was<br />

implanted in the central area of the Córrego Lagoinha watershed. The pre-urbanization<br />

scenery was the reference to dimensioning the control structure. The sceneries simulation<br />

showed that for an increase of 54% in the in<strong>de</strong>x of impermeable area, the peak discharge<br />

can suffer an increase of 59,40% on the peak discharge of the pre-urbanization scenery. In<br />

the face of those increments, the net pluvial drainage installed showed insufficient to drain<br />

the new coming discharge, affirming the need to use alternative measures for the flood<br />

control. The control structure adopted in this case showed a reliable reduction of the<br />

hydrograph peak to the watershed, in up to 45,13%, and it also allowed a retard of 30<br />

minutes in the discharge peak time.<br />

Keywords: retention reservoir, runoff control, urban drainage, reduction of discharge peak,<br />

centralized control.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!