<strong>Installation</strong> instructions<br />

Gas<br />

Adjustment<br />

During new installation or conversion to another gas type, gas<br />

consumers must be set to, or checked for, the rated heat load in<br />

accordance with national <strong>and</strong>/or regional codes, e.g., in Germany:<br />

DVGW TRGI or TRF, this work to be done by contract installation firms,<br />

conversion firms, maintenance firms or gas utility firms.<br />

In order to control heat input the following checks are necessary:<br />

Gas connection must be carried out by a qualified gas fitter in<br />

=<br />

accordance with the locally applicable regulations.<br />

If changing to other types of gas, be absolutely certain to observe<br />

=<br />

the relevant instructions!<br />

All gas pipes <strong>and</strong> connections must be checked using suitable<br />

=<br />

instruments to ensure that there is no leakage!<br />

- The appliance is designed for a maximum operating pressure of<br />

50 millibar. The connection terminal should be checked for signs of<br />

leakage at a maximum pressure of 150 millibar. The fittings must<br />

not be operated during this check. Checking of present type of gas<br />

against specification on appliance.<br />

- Check the connection pressure.<br />

Function check<br />

- Check the connection pressure (flow pressure): connect pressure<br />

meter to pressure measuring nipple 4 on burner nozzle assembly.<br />

Switch on the burners <strong>and</strong> check whether the permitted connection<br />

pressure is maintained.<br />

After measurement, close the sealing screw of the pressure<br />

=<br />

measurement nipple again.<br />

- Before the gas is lit for the first time, there will be air in the pipes.<br />

For this reason ignition will take a little time. If LED display „gas<br />

fault“ comes on, acknowledge message by pressing the according<br />

key.<br />

- Check for ignition, cross-lighting <strong>and</strong> flame stability.<br />

Fill the appliance with the minimum amount of water. Set a low target<br />

temperature (see operating instructions) <strong>and</strong> observe the adjustment.<br />

Shortly before reaching the target temperature, the pan switches to the<br />

simmering level (low energy consumption). After reaching the target<br />

temperature the control switches off (heating display is extinguished).<br />

For subsequent heating, first of all the simmering level is activated. In<br />

case of larger temperature differences the appliance is set to maximum<br />

output. If this is not the case, check the installation.<br />

Then set the target temperature as required (see operating<br />

instructions).<br />

Mounting the company label<br />

After carrying out a function check of the appliance the company label<br />

must be mounted.<br />

Before using the appliance for the first time<br />

Clean the appliance before using it for the first time. See operating<br />

instructions.<br />

34 FGS/UGS 07 25 17 Bl.34