Betriebs- und Installationsanweisung Operating and Installation ...
Betriebs- und Installationsanweisung Operating and Installation ...
Betriebs- und Installationsanweisung Operating and Installation ...
Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.
YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.
<strong>Installation</strong> instructions<br />
Gas<br />
Adjustment<br />
During new installation or conversion to another gas type, gas<br />
consumers must be set to, or checked for, the rated heat load in<br />
accordance with national <strong>and</strong>/or regional codes, e.g., in Germany:<br />
DVGW TRGI or TRF, this work to be done by contract installation firms,<br />
conversion firms, maintenance firms or gas utility firms.<br />
In order to control heat input the following checks are necessary:<br />
Gas connection must be carried out by a qualified gas fitter in<br />
=<br />
accordance with the locally applicable regulations.<br />
If changing to other types of gas, be absolutely certain to observe<br />
=<br />
the relevant instructions!<br />
All gas pipes <strong>and</strong> connections must be checked using suitable<br />
=<br />
instruments to ensure that there is no leakage!<br />
- The appliance is designed for a maximum operating pressure of<br />
50 millibar. The connection terminal should be checked for signs of<br />
leakage at a maximum pressure of 150 millibar. The fittings must<br />
not be operated during this check. Checking of present type of gas<br />
against specification on appliance.<br />
- Check the connection pressure.<br />
Function check<br />
- Check the connection pressure (flow pressure): connect pressure<br />
meter to pressure measuring nipple 4 on burner nozzle assembly.<br />
Switch on the burners <strong>and</strong> check whether the permitted connection<br />
pressure is maintained.<br />
After measurement, close the sealing screw of the pressure<br />
=<br />
measurement nipple again.<br />
- Before the gas is lit for the first time, there will be air in the pipes.<br />
For this reason ignition will take a little time. If LED display „gas<br />
fault“ comes on, acknowledge message by pressing the according<br />
key.<br />
- Check for ignition, cross-lighting <strong>and</strong> flame stability.<br />
Fill the appliance with the minimum amount of water. Set a low target<br />
temperature (see operating instructions) <strong>and</strong> observe the adjustment.<br />
Shortly before reaching the target temperature, the pan switches to the<br />
simmering level (low energy consumption). After reaching the target<br />
temperature the control switches off (heating display is extinguished).<br />
For subsequent heating, first of all the simmering level is activated. In<br />
case of larger temperature differences the appliance is set to maximum<br />
output. If this is not the case, check the installation.<br />
Then set the target temperature as required (see operating<br />
instructions).<br />
Mounting the company label<br />
After carrying out a function check of the appliance the company label<br />
must be mounted.<br />
Before using the appliance for the first time<br />
Clean the appliance before using it for the first time. See operating<br />
instructions.<br />
34 FGS/UGS 07 25 17 Bl.34