Journal - BACnet Interest Group Europe eV
Journal - BACnet Interest Group Europe eV
Journal - BACnet Interest Group Europe eV
Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.
YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.
über den CAN-Bus Daten<br />
aus. Die Raumautomation<br />
steuert Temperatur, Beleuchtung<br />
und Sonnenschutz in<br />
den Büroräumen genau nach<br />
den Erfordernissen der Mitarbeiter.<br />
Im Tower Frankfurt wurden<br />
264 IO-Module eingebaut.<br />
Dies entspricht 2.740 physikalischen<br />
Datenpunkten. Im<br />
Tower Berlin wurden 2.560<br />
physikalische Datenpunkte<br />
implementiert und 254 IO-<br />
Module eingesetzt.<br />
Equipping an airport tower<br />
with most modern and reliable<br />
MSR technology is always<br />
a special challenge for<br />
a company which produces<br />
building automation. The<br />
equipment and supervision<br />
of flight security concerns a<br />
highly sensitive area.<br />
Under the leadership of the<br />
building automation branch<br />
of Plüth in Rhein-Main,<br />
two towers which were ordered<br />
by the “Deutsche Flugsicherung<br />
GmbH (DFS)”<br />
were finished during the last<br />
few weeks. First, the tower at<br />
the Frankfurt / Main airport,<br />
which still had to be built<br />
and then also the new building<br />
at the “Berlin-Brandenburg<br />
International Airport<br />
(BBI)”. In January 2009, the<br />
foundation stone was laid<br />
for the airport tower Frankfurt<br />
am Main. Its commissioning<br />
is planned for June,<br />
2011.<br />
New towers in Frankfurt/<br />
Main and Berlin<br />
The new building of the 70 m<br />
high tower was necessary,<br />
as the new runways on the<br />
south side of the airport were<br />
no longer observable. With<br />
100 square meters, the new<br />
tower pulpit is immediately<br />
40 square metres bigger than<br />
the present one and provides<br />
room for 12 employees.<br />
With a height of 72 m, it is<br />
the second-highest tower in<br />
Germany and therefore a<br />
landmark of the new capital<br />
airport. The newly developed<br />
elliptical tower pulpit<br />
with only four carrying<br />
supports has room for 11<br />
employees, and in case of<br />
expected growth in traffic<br />
volume, further capacity for<br />
additional work space is possible.<br />
The technical standard<br />
A very high standard was<br />
chosen for the technical<br />
building equipment. In both<br />
projects redundant ventilation<br />
systems and redundant<br />
plants were integrated for<br />
warmth and cooling supply<br />
into the <strong>BACnet</strong> automa-<br />
tion system COSMOS 4000<br />
OPEN. This makes sure that<br />
in case of controller failure<br />
another controller will take<br />
over the regulation, control<br />
and automation of the ventilation<br />
systems and other<br />
functions in seconds. Altogether,<br />
ten high-performance<br />
controllers were installed<br />
each tower.<br />
The electrical work was also<br />
integrated in to the COS-<br />
MOS system. Owing to the<br />
size of the I / O modules (automat<br />
profile) these could<br />
be installed directly into<br />
the electrical distributors.<br />
On this occasion, the lighting<br />
and blind control was<br />
also integrated in the <strong>BACnet</strong><br />
controllers. With room<br />
control units, which were<br />
connected via CAN-Bus,<br />
individual control is possible.<br />
Further Bus-protocols<br />
like M-Bus and MOD-Bus<br />
are already installed in the<br />
COSMOS 4000 OPEN controller.<br />
The controllers of the<br />
heat pumps, as well as numerous<br />
universal measuring<br />
devices and the USV, are<br />
coupled via MOD-Bus.<br />
The compact size of the<br />
COSMOS I/O modules allows<br />
a decentralised placement<br />
in the rooms. Data exchange<br />
in the rooms is possible<br />
via the <strong>BACnet</strong> network<br />
Anwendungen Solutions<br />
Deutsche Flugsicherung –<br />
Tower Flughafen Frankfurt.<br />
German Air Traffic Control –<br />
Frankfurt Airport tower.<br />
and also via CAN-Bus. The<br />
room automation controls<br />
temperature, lighting and<br />
solar protection in the offices<br />
exactly according to the<br />
requirements of the employees.<br />
264 I/O modules were<br />
installed in the Frankfurt<br />
tower. These are 2,740 physical<br />
data points. In the Berlin<br />
tower 2,560 physical data<br />
points were implemented<br />
and 254 I/O modules were<br />
used.<br />
Klaus Keck<br />
Leiter der Niederlassung<br />
Rhein-Main<br />
Plüth Gebäudeautomation<br />
Tochter der DEOS AG<br />
rhein-main@plueth.de<br />
www.deos-ag.com<br />
<strong>BACnet</strong> <strong>Europe</strong> <strong>Journal</strong> 14 03/11<br />
31