Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.
YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.
<strong>atw</strong> Vol. 62 (<strong>2017</strong>) | Issue 8/9 ı August/September<br />
No. Event Remarks<br />
ENVIRONMENT AND SAFETY 540<br />
1 TLOFW Start<br />
2 Reactor/TBN/RCP trip SG WR17.03MPa<br />
6 Start of bleed No.5+637sec<br />
7<br />
SIP injection signal<br />
SIP injection start<br />
measurement has an uncertainty, but<br />
the values are acceptable for analysis.<br />
Overall results show that SPACE code<br />
have a reasonable agreement with<br />
target values in steady state analysis.<br />
The steady-state results are established<br />
for conducting a null transient<br />
calculation.<br />
4 Results and discussions<br />
4.1 Sequence of events<br />
The simulation scenario is OECD-<br />
ATLAS A3.1 test, which is a TLOFW<br />
with additional failures. It is assumed<br />
that 2 out of 4 safety injection pump<br />
(SIP) and half of the pilot-operated<br />
safety relief valve (POSRV) are<br />
unavailable to simulate additional<br />
failures during entire test period.<br />
However, passive components such as<br />
the safety injection tank (SIT) and the<br />
main steam safety valve (MSSV) are<br />
assumed to be fully available. Note<br />
that the supply of auxiliary feedwater<br />
is unavailable under the TLOFW<br />
event.<br />
The TLOFW with additional<br />
failures is initiated by terminating the<br />
P PZR