<strong>atw</strong> Vol. 62 (<strong>2017</strong>) | Issue 8/9 ı August/September<br />

No. Event Remarks<br />

ENVIRONMENT AND SAFETY 540<br />

1 TLOFW Start<br />

2 Reactor/TBN/RCP trip SG WR17.03MPa<br />

6 Start of bleed No.5+637sec<br />

7<br />

SIP injection signal<br />

SIP injection start<br />

measurement has an uncertainty, but<br />

the ­values are acceptable for analysis.<br />

Overall results show that SPACE code<br />

have a reasonable agreement with<br />

­target values in steady state analysis.<br />

The steady-state results are established<br />

for conducting a null transient<br />

calculation.<br />

4 Results and discussions<br />

4.1 Sequence of events<br />

The simulation scenario is OECD-­<br />

ATLAS A3.1 test, which is a TLOFW<br />

with additional failures. It is assumed<br />

that 2 out of 4 safety injection pump<br />

(SIP) and half of the pilot-operated<br />

safety relief valve (POSRV) are<br />

­un­available to simulate additional<br />

failures during entire test period.<br />

However, passive components such as<br />

the safety injection tank (SIT) and the<br />

main steam safety valve (MSSV) are<br />

assumed to be fully available. Note<br />

that the supply of auxiliary feedwater<br />

is unavailable under the TLOFW<br />

event.<br />

The TLOFW with additional<br />

­failures is initiated by terminating the<br />

P PZR