JP 4-01.5 JTTP for Water Terminal Operations - BITS
JP 4-01.5 JTTP for Water Terminal Operations - BITS
JP 4-01.5 JTTP for Water Terminal Operations - BITS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
JOINT DOCTRINE PUBLICATIONS HIERARCHY<br />
JOINT PUB 1-0<br />
PERSONNEL<br />
and<br />
ADMINISTRATION<br />
All joint doctrine and tactics, techniques, and procedures are organized into a comprehensive hierarchy<br />
as shown in the chart above. Joint Pub 4-<strong>01.5</strong> is in the Logistics series of joint doctrine publications.<br />
The diagram below illustrates an overview of the development process:<br />
STEP #5<br />
Assessments/Revision<br />
The CINCS receive the pub and<br />
begin to assess it during use<br />
18 to 24 months following<br />
publication, the Director J-7, will<br />
solicit a written report from the<br />
combatant commands and<br />
Services on the utility and quality<br />
of each pub and the need <strong>for</strong> any<br />
urgent changes or earlier-thanscheduled<br />
revisions<br />
No later than 5 years after<br />
development, each pub is revised<br />
ENHANCED<br />
JOINT<br />
WARFIGHTING<br />
CAPABILITY<br />
JOINT PUB 2-0<br />
INTELLIGENCE<br />
JOINT PUB 3-0 JOINT PUB 4-0<br />
JOINT PUB 5-0 JOINT PUB 6-0<br />
OPERATIONS LOGISTICS<br />
PLANS<br />
C4 SYSTEMS<br />
Submitted by Services, CINCS, or Joint Staff<br />
to fill extant operational void<br />
J-7 validates requirement with Services and<br />
CINCs<br />
J-7 initiates Program Directive<br />
Assessments/<br />
Revision<br />
CJCS<br />
Approval<br />
STEP #4<br />
CJCS Approval<br />
Lead Agent <strong>for</strong>wards proposed pub to Joint Staff<br />
Joint Staff takes responsibility <strong>for</strong> pub, makes<br />
required changes and prepares pub <strong>for</strong><br />
coordination with Services and CINCS<br />
Joint Staff conducts <strong>for</strong>mal<br />
staffing <strong>for</strong> approval as a Joint Publication<br />
JOINT PUB 1<br />
JOINT<br />
WARFARE<br />
JOINT PUB 0-2<br />
UNAAF<br />
STEP #1<br />
Project Proposal<br />
Project<br />
Proposal<br />
JOINT<br />
DOCTRINE<br />
PUBLICATION<br />
Program<br />
Directive<br />
Two<br />
Drafts<br />
STEP #2<br />
Program Directive<br />
J-7 <strong>for</strong>mally staffs with<br />
Services and CINCS<br />
Includes scope of project,<br />
references, milestones,<br />
and who will develop<br />
drafts<br />
J-7 releases Program<br />
Directive to Lead Agent.<br />
Lead Agent can be<br />
Service, CINC, or Joint<br />
Staff (JS) Directorate<br />
STEP #3<br />
Two Drafts<br />
Lead Agent selects Primary Review Authority<br />
(PRA) to develop the pub<br />
PRA develops two draft pubs<br />
PRA staffs each draft with CINCS, Services,<br />
and Joint Staff