29.03.2013 Views

January 2006 (PDF 2.9 MB) - Barrick Gold Corporation

January 2006 (PDF 2.9 MB) - Barrick Gold Corporation

January 2006 (PDF 2.9 MB) - Barrick Gold Corporation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cowal <strong>Gold</strong> Project – Cyanide Management Plan<br />

• Consent Condition 8.8 which requires Independent Environmental Audits to be conducted, as well<br />

as the establishment of an Independent Monitoring Panel. This condition is addressed in<br />

Section 10.<br />

• Consent Condition 9.2 which requires the preparation of an Annual Environmental Management<br />

Report (AEMR). This condition is addressed in Section 9.1.<br />

• Consent Condition 10 which outlines requirements for the receipt, response and reporting of<br />

community comments and complaints. This condition is addressed in Section 8.2.1.<br />

2.2 MINING LEASE 1535<br />

The DMR also has requirements that relate to the use of cyanide as detailed in the Conditions of<br />

Authority for ML 1535. These include:<br />

• Condition of Authority 25 which requires mining operations to be conducted in accordance with a<br />

MOP. This Condition of Authority is referred to in Section 3.2.<br />

• Condition of Authority 26 which requires an AEMR to be prepared. This Condition of Authority is<br />

addressed in Section 9.1.<br />

• Condition of Authority 28 which requires the leaseholder not to use cyanide or any solution<br />

containing cyanide without the prior written approval of the Minister for Mineral Resources and<br />

subject to any conditions stipulated. This Condition of Authority is addressed in Section 1.2.<br />

2.3 EPL 11912 CONDITIONS<br />

The EPA has additional requirements that relate to cyanide management and monitoring as detailed in<br />

Environmental Protection Licence (EPL) 11912. These include:<br />

• Operating condition 04 which requires the tailings storages and contained water storage facilities<br />

to have a basal barrier or impermeable liner with an equivalent permeability of 1x10 -9 metres per<br />

second over a thickness of 1 metre. This condition is addressed in Section 4.2.3.3.<br />

• Monitoring and recording condition M1 which outlines requirements for monitoring records for<br />

samples collected for the purpose of the EPL. This condition is addressed in Section 6.4.<br />

• Monitoring and recording condition M2 which requires the monitoring of CNWAD at a number of<br />

points within the mine site. This condition is addressed in Section 6.4.<br />

• Monitoring and recording conditions M4 and M5 which require the licensee to provide a telephone<br />

complaints line and keep a record of all complaints made in relation to pollution arising from a<br />

licensed activity. This condition is addressed in Section 8.2.2.<br />

• Reporting condition R2 which requires the licensee to notify the EPA of incidents causing or<br />

threatening material harm to the environment. This condition is addressed in Section 9.2.<br />

HAL-02-07/1/25/CMP-01-Q.DOC 8 BARRICK

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!