10.2.2 Independent Monitoring Panel<br />

Cowal <strong>Gold</strong> Project – Cyanide Management Plan<br />

The Independent Monitoring Panel will, amongst other things, review the Independent Audit required by<br />

Consent Condition 8.8(a). In accordance with Consent Condition 8.8(b):<br />

(i) The Applicant shall at its own cost establish an Independent Monitoring Panel prior to<br />

commencement of construction. The Applicant shall contribute $30,000 per annum for the<br />

functioning of the Panel, unless otherwise agreed by the Director-General. The annual payment<br />

shall be indexed according to the Consumer Price Index (CPI) at the time of payment. The first<br />

payment shall be paid by the date of commencement of construction and annually thereafter.<br />

Selection of the Panel representatives shall be agreed by the Director-General in consultation with<br />

relevant government agencies and the CEMCC. The Panel shall at least comprise two duly qualified<br />

independent environmental scientists and a representative of the Director-General.<br />

(ii) The panel shall:<br />

a. provide an overview of the independent audits required by condition 8.9 above;<br />

b. regularly review all environmental monitoring procedures undertaken by the Applicant, and<br />

monitoring results; and<br />

c. provide an Annual State of the Environment Report for Lake Cowal with particular reference<br />

to the on-going interaction between the mine and the Lake and any requirements of the<br />

Director-General. The first report shall be prepared one year after commencement of<br />

construction. The report shall be prepared annually thereafter unless otherwise directed by<br />

the Director-General. Copies of the report shall be provided to those parties which receive<br />

the AEMR (condition 9.2) and shall be made publicly available at Bland Shire Council within<br />

two weeks of the report’s completion.<br />

10.3 INTERNAL REVIEW<br />

In accordance with Consent Condition 3.2 the CMP will be revised/updated at least every five years, or<br />

as otherwise directed by the Director-General for Planning, in consultation with the relevant<br />

government authorities.<br />

The cyanide monitoring programme will be revised/updated annually, unless otherwise directed by the<br />

Director-General, to reflect changing environmental requirements, significant changes in technology/<br />

operational practices and results from the monitoring conducted in accordance with Consent<br />

Condition 8. The changes will be made and approved through the AEMR process.<br />

11 REFERENCES<br />

American Public Health Association (APHA) (1998). Standard Methods for the Examination of Water<br />

and Wastewater, 20th Edition, 4500-CN. American Public Health Association, Washington.<br />

Australian Heritage Commission (1992). Register of the National Estate. Detailed Place Report for<br />

Lake Cowal. Australian Heritage Commission, Canberra.<br />

<strong>Barrick</strong> Australia Limited (2003a). Cowal <strong>Gold</strong> Project Hazardous Waste and Chemical Management<br />

Plan.<br />

<strong>Barrick</strong> Australia Limited (2003b). Cowal <strong>Gold</strong> Project Site Water Management Plan.<br />