January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Cowal <strong>Gold</strong> Project – Cyanide Management Plan<br />
<strong>Barrick</strong> Australia Limited (2003c). Cowal <strong>Gold</strong> Project Monitoring Programme for Detection of<br />
Movement of Lake Protection Bund, Water Storage and Tailings Structures and Pit/Void<br />
Walls.<br />
<strong>Barrick</strong> Australia Limited (2003d). Cowal <strong>Gold</strong> Project Flora and Fauna Management Plan.<br />
<strong>Barrick</strong> Australia Limited Ltd (2005a). Cowal <strong>Gold</strong> Project Mining Operations Plan (ML 1535)<br />
March 2005 – June 2007.<br />
<strong>Barrick</strong> Australia Limited (2005b). Cowal <strong>Gold</strong> Project Implementation Plan to Protect Fauna from<br />
Interactions with the Tailings Storage Facilities.<br />
Department of Mineral Resources (DMR) (2002). Minerals Industry Safety Handbook.<br />
Environment Australia (2003). Best Practice Environmental Management in Mining – Cyanide<br />
Management. Best Practice Environmental Management in Mining Series. Commonwealth<br />
of Australia.<br />
Environment Protection Authority (EPA) (1999). Environmental Guidelines: Assessment, Classification<br />
and Management of Liquid and Non-liquid Wastes. Department of Environment and<br />
Conservation (NSW).<br />
International Cyanide Management Institute (2002). International Cyanide Management Code for the<br />
Manufacture, Transport and Use of Cyanide in the Production of <strong>Gold</strong>.<br />
North Limited (1998). Cowal <strong>Gold</strong> Project: Environmental Impact Statement. Prepared by Resource<br />
Strategies Pty Ltd.<br />
Pinnacle Risk Management Pty Ltd (2004a). HAZOP Study Report Cowal <strong>Gold</strong> Project, NSW. Report<br />
prepared for <strong>Barrick</strong> Australia Limited.<br />
Pinnacle Risk Management Pty Ltd (2004b). Final Hazard Analysis Cowal <strong>Gold</strong> Project, NSW. Report<br />
prepared for <strong>Barrick</strong> Australia Limited.<br />
Pinnacle Risk Management Pty Ltd (2005a). Supplementary HAZOP Study Report Cowal <strong>Gold</strong> Project,<br />
NSW. Report prepared for <strong>Barrick</strong> Australia Limited.<br />
Pinnacle Risk Management Pty Ltd (2005b). Fire Safety Study Cowal <strong>Gold</strong> Project, NSW. Report<br />
prepared for <strong>Barrick</strong> Australia Limited.<br />
United States Environmental Protection Agency (USEPA) (1998). Method OIA-1677, Available Cyanide<br />
by Flow Injection, Ligand Exchange, and Amperometry. USEPA.<br />
HAL-02-07/1/25/CMP-01-Q.DOC 32 BARRICK