January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
January 2006 (PDF 2.9 MB) - Barrick Gold Corporation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1.2 PLAN OBJECTIVES AND SCOPE<br />
Cowal <strong>Gold</strong> Project – Cyanide Management Plan<br />
The objectives of this Plan are to fulfil the relevant consent conditions by providing:<br />
• measures to contain cyanide contaminated waters entirely within the mine site;<br />
• measures to maintain CNWAD (weak acid dissociable cyanide) levels at the discharge point to the<br />
tailings dams to the levels stated in Consent Condition 5.3(a);<br />
• contingency measures for cyanide reduction; and<br />
• a cyanide monitoring programme.<br />
The CMP is structured as follows:<br />
Section 1: Introduces the Project and outlines the objectives and structure of the Plan.<br />
Section 2: Identifies the Development Consent, Mining Lease and Environmental Protection<br />
Licence conditions applicable to the Plan.<br />
Section 3: Outlines the site management system, plans and studies relevant to cyanide<br />
management.<br />
Section 4: Describes cyanide containment and management measures.<br />
Section 5: Describes wildlife management in relation to cyanide.<br />
Section 6: Describes the cyanide monitoring programme.<br />
Section 7: Outlines contingency measures for cyanide reduction and the process for EPA review<br />
of cyanide levels in the event of wildlife deaths occurring due to cyanide.<br />
Section 8: Summarises stakeholder consultation and complaints receipt.<br />
Section 9: Details reporting requirements for issues related to cyanide management and<br />
monitoring.<br />
Section 10: Outlines auditing and review requirements.<br />
In accordance with the requirements of Consent Conditions 5.3(b) and 8.2(b), the Department of<br />
Mineral Resources (DMR, now part of the Department of Primary Industries [DPI]), Environment<br />
Protection Authority (EPA, now part of the Department of Environment and Conservation [DEC]) and<br />
the Department of Land and Water Conservation (DLWC, now part of the Department of Natural<br />
Resources [DNR]) have been consulted during the preparation of this CMP. The CMP will be prepared<br />
to the satisfaction of the Director-General for Planning, prior to any use of cyanide on the site in<br />
accordance with Consent Condition 5.3(b). In addition, and in accordance with the requirements of<br />
Condition of Authority 28 for Mining Lease (ML) 1535, cyanide or any solution containing cyanide for<br />
the recovery of minerals on the lease area will not be used without the prior written approval of the<br />
Minister for Mineral Resources and subject to any conditions stipulated by the Minister.<br />
HAL-02-07/1/25/CMP-01-Q.DOC 3 BARRICK